X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124182206002

Well Details

Well ID: 0124182206002
Loading map...
Location: 00/06-22-012-18W4/2
Location Alias: 00/06-22-12-18 W4M
Location Alias 2: 00/06-22-012-18 W4/02
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 18
Section: 22
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 6-22-12-18
Operator Name: SanLing Energy Ltd.
License Number: 0058747
License Date: 1976-06-17
License Status: Abandoned
Spud Date: 1976-06-24
Final Drill Date: 1976-07-01
Well Total Depth: 1123.50 m
Surface Hole Latitude: 50.011022
Surface Hole Longitude: -112.385962

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-06-17 Obtained License
1976-07-01 Drill Stem Test Performed
1976-07-01 Finished Drilling
1976-07-01 Well Mode changed to Drilled and Cased
1976-07-03 Drill Stem Test Performed
1976-07-03 Production Casing Operation Performed
1976-08-14 Perforation Treatment Performed - Jet Perforation
1979-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-12-06 Perforation Treatment Performed - Jet Perforation
1979-12-21 Well Began Production
1979-12-21 Well Fluid changed to Crude Oil
1979-12-21 Well Mode changed to Pumping
1980-09-07 Perforation Treatment Performed - Fractured
1983-10-18 Well Fluid changed to Crude Oil
1983-10-18 Well Log Performed
1983-10-18 Well Mode changed to Suspended
1983-10-31 Well Began Injection
1983-10-31 Well Fluid changed to Carbon Dioxide
1983-10-31 Well Type changed to Injection
1987-05-01 Well Fluid changed to Water
1987-05-01 Well Type changed to Injection
1987-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-01 Well Fluid changed to Gas
1990-07-01 Well Type changed to Injection
1991-05-02 Well Fluid changed to Carbon Dioxide
1991-05-02 Well Type changed to Injection
1994-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-12-09 Perforation Treatment Performed - Cement Plug
1999-12-09 Plug Back Performed
1999-12-09 Well Abandoned
1999-12-09 Well Fluid changed to Carbon Dioxide
1999-12-09 Well Mode changed to Abandoned
1999-12-09 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-14 Perforation 1104.60 1105.20 7
1999-12-09 Cement Plug 120.00 499.00 0
1979-12-05 Packing Device Capped w/Cement 1092.00 1095.00 0
1979-12-06 Perforation 1067.00 1068.90 0
1979-12-06 Perforation 1069.80 1071.10 0
1980-09-07 Fracture 1067.00 1071.10 0
1987-06-06 Acid Treatment 1067.00 1071.10 0
1994-03-01 Acid Treatment 1067.00 1071.10 0
1999-12-09 Cement Plug 785.00 1081.00 0
1999-12-09 Cement Plug 499.00 785.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 264 0.0 0.0 0.0
1980 8089 0.0 0.0 0.0
1981 3348 0.0 0.0 0.0
1982 3076 0.0 0.0 0.0
1983 1953 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0

For data sources see[5]

References