X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124182206000

Well Details

Well ID: 0124182206000
Loading map...
Location: 00/06-22-012-18W4/0
Location Alias: 00/06-22-12-18 W4M
Location Alias 2: 00/06-22-012-18 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 18
Section: 22
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 6-22-12-18
Operator Name: SanLing Energy Ltd.
License Number: 0058747
License Date: 1976-06-17
License Status: Abandoned
Spud Date: 1976-06-24
Final Drill Date: 1976-07-01
Well Total Depth: 1123.50 m
Surface Hole Latitude: 50.011022
Surface Hole Longitude: -112.385962

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-06-17 Obtained License
1976-07-01 Drill Stem Test Performed
1976-07-01 Finished Drilling
1976-07-03 Drill Stem Test Performed
1976-07-03 Production Casing Operation Performed
1976-07-08 Well Mode changed to Drilled and Cased
1976-08-14 Perforation Treatment Performed - Jet Perforation
1977-09-13 Well Began Production
1977-09-13 Well Fluid changed to Gas
1977-09-13 Well Mode changed to Flowing
1977-12-01 Well Fluid changed to Gas
1977-12-01 Well Mode changed to Suspended
1979-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-12-05 Well Fluid changed to Gas
1979-12-05 Well Mode changed to Abandoned Zone
1979-12-06 Perforation Treatment Performed - Jet Perforation
1980-09-07 Perforation Treatment Performed - Fractured
1983-10-18 Well Log Performed
1987-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-12-09 Perforation Treatment Performed - Cement Plug
1999-12-09 Plug Back Performed
1999-12-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-14 Perforation 1104.60 1105.20 7
1999-12-09 Cement Plug 120.00 499.00 0
1979-12-05 Packing Device Capped w/Cement 1092.00 1095.00 0
1979-12-06 Perforation 1067.00 1068.90 0
1979-12-06 Perforation 1069.80 1071.10 0
1980-09-07 Fracture 1067.00 1071.10 0
1987-06-06 Acid Treatment 1067.00 1071.10 0
1994-03-01 Acid Treatment 1067.00 1071.10 0
1999-12-09 Cement Plug 785.00 1081.00 0
1999-12-09 Cement Plug 499.00 785.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 79 0.0 0.0 0.0
1979 85 0.0 0.0 0.0

For data sources see[5]

References