X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124180412003

Well Details

Well ID: 0124180412003
Loading map...
Location: 00/12-04-012-18W4/3
Location Alias: 00/12-04-12-18 W4M
Location Alias 2: 00/12-04-012-18 W4/03
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 18
Section: 04
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 12-4-12-18
Operator Name: SanLing Energy Ltd.
License Number: 0106686
License Date: 1984-04-04
License Status: Issued
Spud Date: 1984-04-03
Final Drill Date: 1984-04-08
Well Total Depth: 1144.00 m
Surface Hole Latitude: 49.971056
Surface Hole Longitude: -112.415044

For data sources see[1][2]

Well History

Date Event
1984-04-01 Well Log Performed
1984-04-04 Obtained License
1984-04-08 Finished Drilling
1984-04-08 Well Log Performed
1984-04-08 Well Mode changed to Drilled and Cased
1984-04-09 Production Casing Operation Performed
1984-04-09 Surface Casing Operation Performed
1984-04-14 Well Log Performed
1984-04-22 Perforation Treatment Performed - Jet Perforation
1984-04-22 Well Log Performed
1984-04-24 Perforation Treatment Performed - Jet Perforation
1984-04-24 Well Log Performed
1984-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-11-13 Plug Back Performed
1984-11-14 Perforation Treatment Performed - Jet Perforation
1984-11-14 Well Log Performed
1984-11-15 Perforation Treatment Performed - Fractured
1984-12-01 Well Began Production
1984-12-01 Well Fluid changed to Crude Oil
1984-12-01 Well Mode changed to Pumping
2012-11-01 Well Fluid changed to Crude Oil
2012-11-01 Well Mode changed to Suspended
2013-07-24 Well Fluid changed to Crude Oil
2013-07-24 Well Mode changed to Pumping
2019-10-01 Well Fluid changed to Crude Oil
2019-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-04-22 Perforation 1098.50 1099.50 13
1984-04-24 Perforation 1091.00 1092.50 13
1984-11-13 Packing Device Capped w/Cement 1089.50 1097.50 0
1984-11-13 Packing Device Capped w/Cement 1080.00 1088.00 0
1984-11-14 Perforation 1065.50 1067.00 13
1984-11-15 Fracture 1065.50 1067.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 738 0.0 0.0 0.0
1985 6960 0.0 0.0 0.0
1986 5038 0.0 0.0 0.0
1987 7634 0.0 0.0 0.0
1988 6577 0.0 0.0 0.0
1989 7457 0.0 0.0 0.0
1990 7415 0.0 0.0 0.0
1991 8282 0.0 0.0 0.0
1992 8228 0.0 0.0 0.0
1993 8419 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8753 0.0 0.0 0.0
1996 8325 0.0 0.0 0.0
1997 8748 0.0 0.0 0.0
1998 8490 0.0 0.0 0.0
1999 8735 0.0 0.0 0.0
2000 8730 0.0 0.0 0.0
2001 8642 0.0 0.0 0.0
2002 8711 0.0 0.0 0.0
2003 8505 0.0 0.0 0.0
2004 8544 0.0 0.0 0.0
2005 8755 0.0 0.0 0.0
2006 8739 0.0 0.0 0.0
2007 8656 0.0 0.0 0.0
2008 8742 0.0 0.0 0.0
2009 8755 0.0 0.0 0.0
2010 3445 0.0 0.0 0.0
2013 3012 0.0 0.0 0.0
2014 949 0.0 0.0 0.0
2015 5488 0.0 0.0 0.0
2016 1358 0.0 0.0 0.0

For data sources see[5]

References