X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124173116000

Well Details

Well ID: 0124173116000
Loading map...
Location: 00/16-31-012-17W4/0
Location Alias: 00/16-31-12-17 W4M
Location Alias 2: 00/16-31-012-17 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 17
Section: 31
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 16-31-12-17
Operator Name: SanLing Energy Ltd.
License Number: 0090286
License Date: 1981-05-25
License Status: Issued
Spud Date: 1981-05-23
Final Drill Date: 1981-05-30
Well Total Depth: 1108.00 m
Surface Hole Latitude: 50.047391
Surface Hole Longitude: -112.305256

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-05-25 Obtained License
1981-05-30 Finished Drilling
1981-05-30 Well Mode changed to Drilled and Cased
1981-06-02 Drill Stem Test Performed
1981-06-03 Drill Stem Test Performed
1981-06-04 Drill Stem Test Performed
1981-06-04 Production Casing Operation Performed
1981-06-10 Perforation Treatment Performed - Jet Perforation
1981-06-12 Perforation Treatment Performed - Fractured
1981-06-29 Well Began Production
1981-06-29 Well Fluid changed to Crude Oil
1981-06-29 Well Mode changed to Flowing
1981-11-01 Well Fluid changed to Crude Oil
1981-11-01 Well Mode changed to Suspended
1984-02-28 Well Log Performed
1984-07-01 Well Fluid changed to Crude Oil
1984-07-01 Well Mode changed to Flowing
1986-01-17 Well Fluid changed to Crude Oil
1986-01-17 Well Mode changed to Pumping
1992-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-01 Well Fluid changed to Crude Oil
1995-04-01 Well Mode changed to Suspended
1999-04-28 Well Log Performed
1999-04-29 Perforation Treatment Performed - Jet Perforation
1999-04-30 Perforation Treatment Performed - Fractured
1999-05-20 Well Fluid changed to Crude Oil
1999-05-20 Well Mode changed to Pumping
2013-01-03 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-06-10 Perforation 1071.80 1073.20 7
1981-06-12 Fracture 1071.80 1073.20 0
1992-07-07 Acid Treatment 1071.80 1073.20 0
1999-04-29 Perforation 1071.70 1073.30 17
1999-04-30 Fracture 1071.70 1073.30 0
2013-01-03 Perforation 1075.00 1081.00 14
2013-01-03 Perforation 1069.00 1073.50 14
2013-01-03 Perforation 1061.00 1067.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1080 0.0 0.0 0.0
1984 3120 0.0 0.0 0.0
1985 6542 0.0 0.0 0.0
1986 7901 0.0 0.0 0.0
1987 8692 0.0 0.0 0.0
1988 8134 0.0 0.0 0.0
1989 8566 0.0 0.0 0.0
1990 8691 0.0 0.0 0.0
1991 8649 0.0 0.0 0.0
1992 5316 0.0 0.0 0.0
1993 8687 0.0 0.0 0.0
1994 8729 0.0 0.0 0.0
1995 1688 0.0 0.0 0.0
1999 5430 0.0 0.0 0.0
2000 2862 0.0 0.0 0.0
2001 8113 0.0 0.0 0.0
2002 8587 0.0 0.0 0.0
2003 8659 0.0 0.0 0.0
2004 8514 0.0 0.0 0.0
2005 6094 0.0 0.0 0.0
2006 6215 0.0 0.0 0.0
2007 8463 0.0 0.0 0.0
2008 8534 0.0 0.0 0.0
2009 7980 0.0 0.0 0.0
2010 8737 0.0 0.0 0.0
2011 8690 0.0 0.0 0.0
2012 8534 0.0 0.0 0.0
2013 8405 0.0 0.0 0.0
2014 8433 0.0 0.0 0.0
2015 8604 0.0 0.0 0.0
2016 759 0.0 0.0 0.0
2017 8248 0.0 0.0 0.0
2018 8183 0.0 0.0 0.0
2019 8712 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References