X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124162013000

Well Details

Well ID: 0124162013000
Loading map...
Location: 00/13-20-012-16W4/0
Location Alias: 00/13-20-12-16 W4M
Location Alias 2: 00/13-20-012-16 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 16
Section: 20
County/Municipality: Municipal District of Taber
Well Name: SLE ENCHANT 13-20-12-16
Operator Name: SanLing Energy Ltd.
License Number: 0101342
License Date: 1983-05-16
License Status: Abandoned
Spud Date: 1983-05-30
Final Drill Date: 1983-06-02
Well Total Depth: 1032.30 m
Surface Hole Latitude: 50.017097
Surface Hole Longitude: -112.162944

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-05-16 Obtained License
1983-06-02 Finished Drilling
1983-06-02 Well Log Performed
1983-06-03 Production Casing Operation Performed
1983-09-01 Perforation Treatment Performed - Jet Perforation
1983-09-01 Well Mode changed to Drilled and Cased
1984-01-18 Well Log Performed
1984-01-19 Well Log Performed
1984-02-01 Well Began Production
1984-02-01 Well Fluid changed to Crude Oil
1984-02-01 Well Mode changed to Flowing
1986-08-05 Perforation Treatment Performed - Jet Perforation
1986-08-06 Perforation Treatment Performed - Cement Squeeze
1986-08-09 Perforation Treatment Performed - Jet Perforation
1986-08-13 Perforation Treatment Performed - Jet Perforation
1986-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-09-24 Plug Back Performed
1986-09-24 Well Abandoned
1986-09-24 Well Fluid changed to Crude Oil
1986-09-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-01 Perforation 995.20 997.50 13
1986-08-05 Perforation 1000.00 1001.00 13
1986-08-06 Cement Squeeze 995.20 1001.00 0
1986-08-09 Perforation 995.20 997.50 13
1986-08-13 Perforation 995.20 997.50 13
1986-09-24 Packing Device Capped w/Cement 984.00 992.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 7143 0.0 0.0 0.0
1985 8324 0.0 0.0 0.0
1986 4771 0.0 0.0 0.0

For data sources see[5]

References