X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124162002022

Well Details

Well ID: 0124162002022
Loading map...
Location: 02/02-20-012-16W4/2
Location Alias: 02/02-20-12-16 W4M
Location Alias 2: 02/02-20-012-16 W4/02
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 16
Section: 20
County/Municipality: Municipal District of Taber
Well Name: SLE ENCHANT 2-20-12-16
Operator Name: SanLing Energy Ltd.
License Number: 0215796
License Date: 1998-06-11
License Status: Suspension
Spud Date: 1998-07-07
Final Drill Date: 1998-07-10
Well Total Depth: 1016.00 m
Surface Hole Latitude: 50.006032
Surface Hole Longitude: -112.150994

For data sources see[1][2]

Well History

Date Event
1998-05-09 Well Log Performed
1998-06-11 Obtained License
1998-07-08 Surface Casing Operation Performed
1998-07-10 Finished Drilling
1998-07-10 Well Log Performed
1998-07-10 Well Mode changed to Drilled and Cased
1998-07-11 Production Casing Operation Performed
1998-07-12 Rig Released
1998-09-04 Perforation Treatment Performed - Jet Perforation
1998-09-04 Well Log Performed
1998-09-05 Perforation Treatment Performed - Bridge Plug No Cement Required
1998-09-05 Perforation Treatment Performed - Jet Perforation
2009-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-05-12 Perforation Treatment Performed - Jet Perforation
2009-05-12 Plug Back Performed
2009-05-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-05-13 Perforation Treatment Performed - Jet Perforation
2009-05-13 Plug Back Performed
2009-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-05-15 Plug Back Performed
2009-12-15 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-09-04 Perforation 996.00 998.50 13
1998-09-05 Bridge Plug, No Cement 995.50 995.80 0
1998-09-05 Perforation 991.00 994.00 13
2009-05-12 Packing Device Capped w/Cement 975.60 983.60 0
2009-05-12 Perforation 870.50 875.00 17
2009-05-13 Packing Device Capped w/Cement 859.50 867.50 0
2009-05-13 Perforation 853.00 855.00 17
2009-05-15 Packing Device Capped w/Cement 841.00 849.00 0

For data sources see[4]



References