X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124161006000

Well Details

Well ID: 0124161006000
Loading map...
Location: 00/06-10-012-16W4/0
Location Alias: 00/06-10-12-16 W4M
Location Alias 2: 00/06-10-012-16 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 16
Section: 10
County/Municipality: Municipal District of Taber
Well Name: SLE ENCHANT 6-10-12-16
Operator Name: SanLing Energy Ltd.
License Number: 0099960
License Date: 1982-12-28
License Status: Suspension
Spud Date: 1982-12-27
Final Drill Date: 1983-01-05
Well Total Depth: 1019.00 m
Surface Hole Latitude: 49.980788
Surface Hole Longitude: -112.113938

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-12-28 Obtained License
1982-12-30 Kick Occurred
1983-01-04 Lost Circulation Occurred
1983-01-05 Finished Drilling
1983-01-05 Kick Occurred
1983-01-05 Well Mode changed to Drilled and Cased
1983-01-07 Production Casing Operation Performed
1983-01-30 Perforation Treatment Performed - Jet Perforation
1983-02-02 Well Began Production
1983-02-02 Well Fluid changed to Crude Oil
1983-02-02 Well Mode changed to Pumping
1983-12-30 Kick Occurred
2001-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-09 Perforation Treatment Performed - Jet Perforation
2001-06-09 Plug Back Performed
2001-06-09 Well Fluid changed to Crude Oil
2001-06-09 Well Log Performed
2001-06-09 Well Mode changed to Abandoned Zone
2006-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-08 Perforation Treatment Performed - Jet Perforation
2006-06-08 Plug Back Performed
2006-06-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-01-30 Perforation 988.00 991.00 13
2001-06-09 Packing Device Capped w/Cement 976.00 984.00 0
2001-06-09 Perforation 716.50 718.00 13
2006-06-08 Perforation 228.00 230.00 17
2006-06-08 Packing Device Capped w/Cement 698.00 706.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 4074 0.0 0.0 0.0
1984 7571 0.0 0.0 0.0
1985 7475 0.0 0.0 0.0
1986 8238 0.0 0.0 0.0
1987 7917 0.0 0.0 0.0
1988 5462 0.0 0.0 0.0
1989 8240 0.0 0.0 0.0
1990 8188 0.0 0.0 0.0
1991 7235 0.0 0.0 0.0
1992 8117 0.0 0.0 0.0
1993 6353 0.0 0.0 0.0
1994 7732 0.0 0.0 0.0
1995 8507 0.0 0.0 0.0
1996 8478 0.0 0.0 0.0
1997 7783 0.0 0.0 0.0
1998 8577 0.0 0.0 0.0
1999 8591 0.0 0.0 0.0
2000 7761 0.0 0.0 0.0
2001 3790 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-12-30 Kick 719.00 937.00
1983-01-04 Lost Circulation 1010.00 1019.00
1983-01-05 Kick 1019.00 1019.00
1983-12-30 Kick 719.00 0.00

For data sources see[6]

References