X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124153106000

Well Details

Well ID: 0124153106000
Loading map...
Location: 00/06-31-012-15W4/0
Location Alias: 00/06-31-12-15 W4M
Location Alias 2: 00/06-31-012-15 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 15
Section: 31
County/Municipality: Municipal District of Taber
Well Name: AMOCO ENCHANT 6-31-12-15
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0058901
License Date: 1976-06-29
License Status: Re-Entered
Spud Date: 1976-06-29
Final Drill Date: 1976-07-01
Well Total Depth: 792.50 m
Surface Hole Latitude: 50.038806
Surface Hole Longitude: -112.043227

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-06-29 Obtained License
1976-06-30 Kick Occurred
1976-07-01 Finished Drilling
1976-07-02 Production Casing Operation Performed
1976-08-20 Perforation Treatment Performed - Jet Perforation
1976-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-23 Well Mode changed to Drilled and Cased
1982-09-22 Well Began Production
1982-09-22 Well Fluid changed to Gas
1982-09-22 Well Mode changed to Flowing
1992-09-22 Perforation Treatment Performed - Jet Perforation
1992-09-22 Well Log Performed
1992-10-19 Well Fluid changed to Gas
1992-10-19 Well Mode changed to Suspended
1993-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-19 Plug Back Performed
1993-03-19 Well Abandoned
1993-03-19 Well Fluid changed to Gas
1993-03-19 Well Mode changed to Abandoned
1993-03-20 Well Fluid changed to Gas
1993-03-20 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-20 Perforation 712.00 712.60 3
1976-08-21 Acid Treatment 712.00 712.60 0
1992-09-22 Perforation 712.00 713.20 13
1993-03-19 Packing Device Capped w/Cement 688.30 696.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2149 0.0 0.0 0.0
1983 4819 0.0 0.0 0.0
1984 5778 0.0 0.0 0.0
1985 8522 0.0 0.0 0.0
1986 7986 0.0 0.0 0.0
1987 8323 0.0 0.0 0.0
1988 7995 0.0 0.0 0.0
1989 7655 0.0 0.0 0.0
1990 7798 0.0 0.0 0.0
1991 6992 0.0 0.0 0.0
1992 6678 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-06-30 Kick 213.40 213.40

For data sources see[6]

References