If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124152710023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.029133,"lon":-111.968167,"icon":""}]} |
Location: 02/10-27-012-15W4/3 | |
Location Alias: 02/10-27-12-15 W4M | |
Location Alias 2: 02/10-27-012-15 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 15 | |
Section: 27 | |
County/Municipality: Municipal District of Taber | |
Well Name: SLE 102 ENCHANT 10-27-12-15 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0376419 | |
License Date: 2007-04-11 | |
License Status: Issued | |
Spud Date: 2007-06-23 | |
Final Drill Date: 2007-06-27 | |
Well Total Depth: 985.00 m | |
Surface Hole Latitude: 50.029133 | |
Surface Hole Longitude: -111.968167 |
Date | Event |
---|---|
2007-04-11 | Obtained License |
2007-06-24 | Surface Casing Operation Performed |
2007-06-27 | Finished Drilling |
2007-06-27 | Well Log Performed |
2007-06-27 | Well Mode changed to Drilled and Cased |
2007-06-28 | Production Casing Operation Performed |
2007-06-28 | Rig Released |
2007-07-11 | Well Log Performed |
2007-07-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-07-12 | Perforation Treatment Performed - Jet Perforation |
2007-07-12 | Plug Back Performed |
2007-07-12 | Well Log Performed |
2007-07-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-07-13 | Perforation Treatment Performed - Jet Perforation |
2007-07-13 | Plug Back Performed |
2007-07-13 | Well Log Performed |
2007-07-15 | Perforation Treatment Performed - Fractured |
2007-09-17 | Well Began Production |
2007-09-17 | Well Fluid changed to Gas |
2007-09-17 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-07-12 | Perforation | 965.00 | 967.00 | 2 |
2007-07-12 | Packing Device Capped w/Cement | 952.00 | 960.00 | 0 |
2007-07-12 | Perforation | 922.00 | 924.00 | 13 |
2007-07-13 | Packing Device Capped w/Cement | 906.00 | 914.00 | 0 |
2007-07-13 | Perforation | 834.00 | 837.00 | 13 |
2007-07-15 | Fracture | 834.00 | 837.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 2059 | 0.0 | 0.0 | 0.0 |
2008 | 7720 | 0.0 | 0.0 | 0.0 |
2009 | 8751 | 0.0 | 0.0 | 0.0 |
2010 | 8631 | 0.0 | 0.0 | 0.0 |
2011 | 8729 | 0.0 | 0.0 | 0.0 |
2012 | 8442 | 0.0 | 0.0 | 0.0 |
2013 | 8349 | 0.0 | 0.0 | 0.0 |
2014 | 8732 | 0.0 | 0.0 | 0.0 |
2015 | 8429 | 0.0 | 0.0 | 0.0 |
2016 | 8496 | 0.0 | 0.0 | 0.0 |
2017 | 8424 | 0.0 | 0.0 | 0.0 |
2018 | 8410 | 0.0 | 0.0 | 0.0 |
2019 | 8719 | 0.0 | 0.0 | 0.0 |
2020 | 2144 | 0.0 | 0.0 | 0.0 |
For data sources see[5]