If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124140811000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.984492,"lon":-111.884548,"icon":""}]} |
Location: 00/11-08-012-14W4/0 | |
Location Alias: 00/11-08-12-14 W4M | |
Location Alias 2: 00/11-08-012-14 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 14 | |
Section: 08 | |
County/Municipality: Municipal District of Taber | |
Well Name: LL&E ET AL GRAND FORKS 11-8-12-14 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0071780 | |
License Date: 1978-09-05 | |
License Status: Re-Entered | |
Spud Date: 1978-09-10 | |
Final Drill Date: 1978-09-16 | |
Well Total Depth: 988.00 m | |
Surface Hole Latitude: 49.984492 | |
Surface Hole Longitude: -111.884548 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-09-05 | Obtained License |
1978-09-16 | Finished Drilling |
1978-09-16 | Well Mode changed to Drilled and Cased |
1978-09-17 | Drill Stem Test Performed |
1978-09-19 | Production Casing Operation Performed |
1978-09-27 | Perforation Treatment Performed - Jet Perforation |
1978-09-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-10-05 | Well Began Production |
1978-10-05 | Well Fluid changed to Crude Oil |
1978-10-05 | Well Mode changed to Pumping |
1989-12-01 | Well Fluid changed to Crude Oil |
1989-12-01 | Well Mode changed to Suspended |
1991-10-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-10-24 | Perforation Treatment Performed - Jet Perforation |
1991-10-24 | Plug Back Performed |
1991-10-24 | Well Log Performed |
1991-10-25 | Perforation Treatment Performed - Remedial Casing |
1991-10-25 | Well Abandoned |
1991-10-25 | Well Fluid changed to Crude Oil |
1991-10-25 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-09-27 | Perforation | 953.00 | 954.00 | 9 |
1978-09-28 | Acid Treatment | 953.00 | 954.00 | 0 |
1991-10-24 | Packing Device Capped w/Cement | 933.00 | 941.00 | 0 |
1991-10-24 | Perforation | 350.00 | 351.00 | 13 |
1991-10-25 | Remedial Casing Cementing | 350.00 | 351.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 1934 | 0.0 | 0.0 | 0.0 |
1979 | 8097 | 0.0 | 0.0 | 0.0 |
1980 | 7887 | 0.0 | 0.0 | 0.0 |
1981 | 6027 | 0.0 | 0.0 | 0.0 |
1982 | 6671 | 0.0 | 0.0 | 0.0 |
1983 | 8385 | 0.0 | 0.0 | 0.0 |
1984 | 8663 | 0.0 | 0.0 | 0.0 |
1985 | 8256 | 0.0 | 0.0 | 0.0 |
1986 | 8327 | 0.0 | 0.0 | 0.0 |
1987 | 8759 | 0.0 | 0.0 | 0.0 |
1988 | 8697 | 0.0 | 0.0 | 0.0 |
1989 | 7162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]