X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124133501000

Well Details

Well ID: 0124133501000
Loading map...
Location: 00/01-35-012-13W4/0
Location Alias: 00/01-35-12-13 W4M
Location Alias 2: 00/01-35-012-13 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 13
Section: 35
County/Municipality: Municipal District of Taber
Well Name: COTTON ET AL RONALANE 1-35-12-13
Operator Name: Cotton Petroleum Corporation
License Number: 0076035
License Date: 1979-05-31
License Status: RecCertified
Spud Date: 1979-06-30
Final Drill Date: 1979-07-08
Well Total Depth: 977.00 m
Surface Hole Latitude: 50.036625
Surface Hole Longitude: -111.670135

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-05-31 Obtained License
1979-07-03 Kick Occurred
1979-07-08 Drill Stem Test Performed
1979-07-08 Finished Drilling
1979-07-08 Well Log Performed
1979-07-08 Well Mode changed to Drilled and Cased
1979-07-09 Drill Stem Test Performed
1979-07-10 Drill Stem Test Performed
1979-07-11 Kick Occurred
1979-07-12 Production Casing Operation Performed
1979-07-28 Perforation Treatment Performed - Jet Perforation
1979-08-26 Well Began Production
1979-08-26 Well Fluid changed to Crude Oil
1979-08-26 Well Mode changed to Flowing
1980-11-24 Well Fluid changed to Crude Oil
1980-11-24 Well Mode changed to Suspended
1982-10-07 Well Fluid changed to Crude Oil
1982-10-07 Well Mode changed to Flowing
1983-12-15 Well Fluid changed to Crude Oil
1983-12-15 Well Mode changed to Suspended
1984-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-10-24 Plug Back Performed
1984-10-24 Well Fluid changed to Crude Oil
1984-10-24 Well Log Performed
1984-10-24 Well Mode changed to Abandoned
1984-10-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-28 Perforation 936.80 938.20 10
1984-10-24 Packing Device Capped w/Cement 922.00 930.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1719 0.0 0.0 0.0
1980 6284 0.0 0.0 0.0
1982 1042 0.0 0.0 0.0
1983 6335 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-07-03 Kick 690.00 690.00
1979-07-11 Kick 977.00 977.00

For data sources see[6]

References