If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124091206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.981866,"lon":-111.108388,"icon":""}]} |
Location: 00/06-12-012-09W4/0 | |
Location Alias: 00/06-12-12-09 W4M | |
Location Alias 2: 00/06-12-012-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 09 | |
Section: 12 | |
County/Municipality: County of Forty Mile No. 8 | |
Well Name: DALCO ET AL BOW ISLAND 6-12-12-9 | |
Operator Name: Marathon Canada Limited | |
License Number: 0087272 | |
License Date: 1980-11-26 | |
License Status: RecCertified | |
Spud Date: 1980-12-11 | |
Final Drill Date: 1980-12-13 | |
Well Total Depth: 759.00 m | |
Surface Hole Latitude: 49.981866 | |
Surface Hole Longitude: -111.108388 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-11-26 | Obtained License |
1980-12-13 | Finished Drilling |
1980-12-13 | Production Casing Operation Performed |
1980-12-15 | Well Mode changed to Drilled and Cased |
1981-02-26 | Perforation Treatment Performed - Jet Perforation |
1981-02-27 | Perforation Treatment Performed - Fractured |
1981-04-09 | Well Began Production |
1981-04-09 | Well Fluid changed to Gas |
1981-04-09 | Well Mode changed to Flowing |
1991-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-09-10 | Plug Back Performed |
1991-09-10 | Well Abandoned |
1991-09-10 | Well Fluid changed to Gas |
1991-09-10 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-02-26 | Perforation | 599.00 | 604.00 | 7 |
1981-02-26 | Perforation | 611.00 | 614.50 | 7 |
1981-02-27 | Fracture | 599.00 | 614.50 | 0 |
1991-09-10 | Packing Device Capped w/Cement | 582.00 | 590.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 6126 | 0.0 | 0.0 | 0.0 |
1982 | 8617 | 0.0 | 0.0 | 0.0 |
1983 | 8007 | 0.0 | 0.0 | 0.0 |
1984 | 8761 | 0.0 | 0.0 | 0.0 |
1985 | 8088 | 0.0 | 0.0 | 0.0 |
1986 | 4294 | 0.0 | 0.0 | 0.0 |
1987 | 742 | 0.0 | 0.0 | 0.0 |
1988 | 8729 | 0.0 | 0.0 | 0.0 |
1989 | 8473 | 0.0 | 0.0 | 0.0 |
1990 | 8745 | 0.0 | 0.0 | 0.0 |
1991 | 6004 | 0.0 | 0.0 | 0.0 |
For data sources see[5]