X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124063306000

Well Details

Well ID: 0124063306000
Loading map...
Location: 00/06-33-012-06W4/0
Location Alias: 00/06-33-12-06 W4M
Location Alias 2: 00/06-33-012-06 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 06
Section: 33
County/Municipality: Medicine Hat
Well Name: CITY OF MEDICINE HAT 6-33-12-6
Operator Name: City Of Medicine Hat
License Number: 0046133
License Date: 1973-06-12
License Status: Issued
Spud Date: 1974-07-01
Final Drill Date: 1974-07-02
Well Total Depth: 417.60 m
Surface Hole Latitude: 50.039930
Surface Hole Longitude: -110.771981

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-06-12 Obtained License
1974-07-02 Finished Drilling
1974-07-02 Production Casing Operation Performed
1974-10-20 Perforation Treatment Performed - Bullet Perforation
1974-10-20 Perforation Treatment Performed - Selective Bullet Perforations
1974-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-11-01 Perforation Treatment Performed - Fractured
1974-11-16 Perforation Treatment Performed - Bullet Perforation
1974-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-11-25 Perforation Treatment Performed - Fractured
1974-11-25 Well Mode changed to Drilled and Cased
1975-06-12 Well Began Production
1975-06-12 Well Fluid changed to Gas
1975-06-12 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-10-20 Selective Bullet Perforations 395.90 401.40 0
1974-11-01 Fracture 349.30 401.40 0
1974-11-16 Bullet Perforation 341.10 342.90 3
1974-11-16 Bullet Perforation 333.50 340.80 7
1974-11-24 Acid Treatment 333.50 342.90 0
1974-11-25 Fracture 333.50 342.90 0
1974-10-20 Selective Bullet Perforations 382.50 384.70 0
1974-10-20 Selective Bullet Perforations 377.00 379.50 0
1974-10-20 Selective Bullet Perforations 367.90 374.60 0
1974-10-20 Selective Bullet Perforations 357.50 361.20 0
1974-10-20 Selective Bullet Perforations 355.10 355.70 0
1974-10-20 Selective Bullet Perforations 353.90 354.50 0
1974-10-20 Bullet Perforation 349.30 352.30 3
1974-10-31 Acid Treatment 349.30 401.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 4848 0.0 0.0 0.0
1976 6035 0.0 0.0 0.0
1977 2688 0.0 0.0 0.0
1978 8423 0.0 0.0 0.0
1979 8759 0.0 0.0 0.0
1980 8520 0.0 0.0 0.0
1981 8759 0.0 0.0 0.0
1982 8759 0.0 0.0 0.0
1983 8759 0.0 0.0 0.0
1984 5639 0.0 0.0 0.0
1985 8759 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 3144 0.0 0.0 0.0
1988 2656 0.0 0.0 0.0
1989 8610 0.0 0.0 0.0
1990 2743 0.0 0.0 0.0
1991 3397 0.0 0.0 0.0
1992 4441 0.0 0.0 0.0
1993 5223 0.0 0.0 0.0
1994 8515 0.0 0.0 0.0
1995 8609 0.0 0.0 0.0
1996 8749 0.0 0.0 0.0
1997 8731 0.0 0.0 0.0
1998 8709 0.0 0.0 0.0
1999 8672 0.0 0.0 0.0
2000 8714 0.0 0.0 0.0
2001 8619 0.0 0.0 0.0
2002 8680 0.0 0.0 0.0
2003 8664 0.0 0.0 0.0
2004 8408 0.0 0.0 0.0
2005 8535 0.0 0.0 0.0
2006 7653 0.0 0.0 0.0
2007 8722 0.0 0.0 0.0
2008 8524 0.0 0.0 0.0
2009 8315 0.0 0.0 0.0
2010 8661 0.0 0.0 0.0
2011 8718 0.0 0.0 0.0
2012 8254 0.0 0.0 0.0
2013 8498 0.0 0.0 0.0
2014 8620 0.0 0.0 0.0
2015 8702 0.0 0.0 0.0
2016 8718 0.0 0.0 0.0
2017 8546 0.0 0.0 0.0
2018 8545 0.0 0.0 0.0
2019 4132 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[5]

References