X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124062716000

Well Details

Well ID: 0124062716000
Loading map...
Location: 00/16-27-012-06W4/0
Location Alias: 00/16-27-12-06 W4M
Location Alias 2: 00/16-27-012-06 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 06
Section: 27
County/Municipality: Medicine Hat
Well Name: CITY OF MEDICINE HAT 16-27-12-6
Operator Name: City Of Medicine Hat
License Number: 0096364
License Date: 1982-06-21
License Status: Issued
Spud Date: 1982-06-29
Final Drill Date: 1982-06-30
Well Total Depth: 443.00 m
Surface Hole Latitude: 50.032054
Surface Hole Longitude: -110.736571

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-06-21 Obtained License
1982-06-30 Finished Drilling
1982-06-30 Production Casing Operation Performed
1982-11-03 Perforation Treatment Performed - Jet Perforation
1982-11-03 Perforation Treatment Performed - Selective Jet Perforations
1982-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-09 Perforation Treatment Performed - Fractured
1982-12-20 Well Mode changed to Drilled and Cased
1983-10-03 Well Began Production
1983-10-03 Well Fluid changed to Gas
1983-10-03 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-11-03 Selective Jet Perforations 364.50 366.50 0
1982-11-08 Acid Treatment 364.50 418.30 0
1982-11-09 Fracture 364.50 418.30 0
1982-11-03 Selective Jet Perforations 368.40 369.40 0
1982-11-03 Selective Jet Perforations 371.00 371.00 0
1982-11-03 Perforation 379.30 382.20 3
1982-11-03 Perforation 407.20 408.70 4
1982-11-03 Perforation 409.50 410.20 5
1982-11-03 Perforation 411.10 412.20 5
1982-11-03 Perforation 413.20 414.60 5
1982-11-03 Perforation 418.00 418.30 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 2112 0.0 0.0 0.0
1984 5639 0.0 0.0 0.0
1985 8759 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 3144 0.0 0.0 0.0
1988 2688 0.0 0.0 0.0
1989 8759 0.0 0.0 0.0
1990 2858 0.0 0.0 0.0
1991 4032 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 5831 0.0 0.0 0.0
1994 8183 0.0 0.0 0.0
1995 7769 0.0 0.0 0.0
1996 8749 0.0 0.0 0.0
1997 8731 0.0 0.0 0.0
1998 8709 0.0 0.0 0.0
1999 8672 0.0 0.0 0.0
2000 8714 0.0 0.0 0.0
2001 8619 0.0 0.0 0.0
2002 8680 0.0 0.0 0.0
2003 8664 0.0 0.0 0.0
2004 6868 0.0 0.0 0.0
2005 8607 0.0 0.0 0.0
2006 7893 0.0 0.0 0.0
2007 7934 0.0 0.0 0.0
2008 8524 0.0 0.0 0.0
2009 8459 0.0 0.0 0.0
2010 8661 0.0 0.0 0.0
2011 8718 0.0 0.0 0.0
2012 8254 0.0 0.0 0.0
2013 2015 0.0 0.0 0.0
2014 2219 0.0 0.0 0.0
2015 7722 0.0 0.0 0.0
2016 8718 0.0 0.0 0.0
2017 8546 0.0 0.0 0.0
2018 6860 0.0 0.0 0.0
2019 4536 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[5]

References