X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124052812020

Well Details

Well ID: 0124052812020
Loading map...
Location: 02/12-28-012-05W4/0
Location Alias: 02/12-28-12-05 W4M
Location Alias 2: 02/12-28-012-05 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 05
Section: 28
County/Municipality: Medicine Hat
Well Name: RESPONSE 102 HZ MEDHAT 12-28-12-5
Operator Name: Response Energy Corporation
License Number: 0447589
License Date: 2012-08-03
License Status: Abandoned
Spud Date: 2012-08-11
Final Drill Date: 2012-08-23
Well Total Depth: 1665.00 m
Surface Hole Latitude: 50.034811
Surface Hole Longitude: -110.632218

For data sources see[1][2]

Well History

Date Event
2012-08-03 Obtained License
2012-08-12 Surface Casing Operation Performed
2012-08-14 Direction Drilling Operation Performed - Deviate
2012-08-16 Direction Drilling Operation Performed - Horizontal
2012-08-17 Well Log Performed
2012-08-18 Intermediate Casing Operation Performed
2012-08-23 Finished Drilling
2012-08-23 Well Log Performed
2012-08-23 Well Mode changed to Drilled and Cased
2012-08-24 Liner Casing Operation Performed
2012-08-24 Perforation Treatment Performed - Slotted Liner or Casing
2012-09-03 Rig Released
2012-10-04 Perforation Treatment Performed - Bridge Plug No Cement Required
2013-02-04 Well Began Production
2013-02-04 Well Fluid changed to Crude Oil
2013-02-04 Well Mode changed to Pumping
2015-03-01 Well Fluid changed to Crude Oil
2015-03-01 Well Mode changed to Suspended
2016-04-01 Well Fluid changed to Crude Oil
2016-04-01 Well Mode changed to Pumping
2016-12-01 Well Fluid changed to Crude Oil
2016-12-01 Well Mode changed to Suspended
2017-09-01 Well Fluid changed to Crude Oil
2017-09-01 Well Mode changed to Pumping
2017-10-01 Well Fluid changed to Crude Oil
2017-10-01 Well Mode changed to Suspended
2018-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-06-21 Plug Back Performed
2018-06-21 Well Fluid changed to Crude Oil
2018-06-21 Well Mode changed to Abandoned Zone
2018-06-26 Well Abandoned

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-11 Quintera Drilling Ltd. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-14 614.30 Deviate (5 - 79 degrees)
2012-08-16 953.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-24 Slotted Liner 1013.00 1665.00 0
2012-10-04 Bridge Plug, No Cement 868.00 868.50 0
2018-06-21 Packing Device Capped w/Cement 860.00 908.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 7505 0.0 0.0 0.0
2014 7860 0.0 0.0 0.0
2015 390 0.0 0.0 0.0
2016 2048 0.0 0.0 0.0
2017 24 0.0 0.0 0.0
2018 0 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-11 No Incident Encountered 0.00 0.00
2012-10-04 No Incident Encountered 0.00 0.00
2018-06-19 No Incident Encountered 0.00 0.00

For data sources see[8]

References