If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124052616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.030876,"lon":-110.574356,"icon":""}]} |
Location: 00/16-26-012-05W4/0 | |
Location Alias: 00/16-26-12-05 W4M | |
Location Alias 2: 00/16-26-012-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 05 | |
Section: 26 | |
County/Municipality: Cypress County | |
Well Name: CITY OF MEDICINE HAT 16-26-12-5 | |
Operator Name: City Of Medicine Hat | |
License Number: 0114054 | |
License Date: 1985-03-20 | |
License Status: Issued | |
Spud Date: 1985-04-18 | |
Final Drill Date: 1985-04-21 | |
Well Total Depth: 903.00 m | |
Surface Hole Latitude: 50.030876 | |
Surface Hole Longitude: -110.574356 |
Date | Event |
---|---|
1985-03-20 | Obtained License |
1985-04-19 | Surface Casing Operation Performed |
1985-04-21 | Finished Drilling |
1985-04-21 | Well Log Performed |
1985-04-21 | Well Mode changed to Drilled and Cased |
1985-04-22 | Production Casing Operation Performed |
1985-04-22 | Rig Released |
1985-05-05 | Well Log Performed |
1985-05-08 | Perforation Treatment Performed - Bullet Perforation |
1985-05-09 | Perforation Treatment Performed - Bullet Perforation |
1985-05-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-05-10 | Plug Back Performed |
1985-05-11 | Perforation Treatment Performed - Bullet Perforation |
1985-05-15 | Perforation Treatment Performed - Bullet Perforation |
1985-06-01 | Well Began Production |
1985-06-01 | Well Fluid changed to Crude Oil |
1985-06-01 | Well Mode changed to Pumping |
1985-07-01 | Well Fluid changed to Crude Oil |
1985-07-01 | Well Mode changed to Suspended |
1989-05-03 | Well Fluid changed to Crude Oil |
1989-05-03 | Well Mode changed to Pumping |
1989-08-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-08-03 | Plug Back Performed |
1989-08-03 | Well Fluid changed to Crude Oil |
1989-08-03 | Well Mode changed to Abandoned Zone |
1989-09-13 | Well Log Performed |
1989-09-28 | Perforation Treatment Performed - Jet Perforation |
1989-09-28 | Well Log Performed |
1989-10-03 | Perforation Treatment Performed - Fractured |
1989-10-10 | Perforation Treatment Performed - Jet Perforation |
1989-10-10 | Well Log Performed |
1989-10-13 | Perforation Treatment Performed - Fractured |
1989-10-30 | Perforation Treatment Performed - Jet Perforation |
1989-10-30 | Well Log Performed |
1989-11-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-11-21 | Perforation Treatment Performed - Cement Squeeze |
1989-11-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-11-27 | Perforation Treatment Performed - Cement Squeeze |
1989-11-27 | Perforation Treatment Performed - Jet Perforation |
1989-11-27 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-05-08 | Bullet Perforation | 898.10 | 900.00 | 7 |
1989-09-28 | Perforation | 401.30 | 402.50 | 6 |
1989-09-28 | Perforation | 403.70 | 404.20 | 6 |
1989-09-28 | Perforation | 406.50 | 407.00 | 6 |
1989-10-03 | Fracture | 397.50 | 407.00 | 0 |
1989-10-10 | Perforation | 355.00 | 364.50 | 2 |
1989-10-10 | Perforation | 370.50 | 374.50 | 5 |
1989-10-13 | Fracture | 355.00 | 374.50 | 0 |
1989-10-30 | Perforation | 257.50 | 258.50 | 6 |
1989-11-21 | Acid Treatment | 257.50 | 258.50 | 0 |
1989-11-21 | Cement Squeeze | 257.50 | 258.50 | 0 |
1985-05-09 | Bullet Perforation | 891.00 | 892.00 | 7 |
1989-11-27 | Perforation | 251.50 | 252.50 | 6 |
1989-11-27 | Acid Treatment | 251.50 | 252.50 | 0 |
1989-11-27 | Cement Squeeze | 251.50 | 252.50 | 0 |
1985-05-09 | Bullet Perforation | 896.00 | 897.90 | 7 |
1985-05-10 | Packing Device Capped w/Cement | 877.00 | 885.00 | 0 |
1985-05-11 | Bullet Perforation | 849.50 | 850.50 | 11 |
1985-05-15 | Bullet Perforation | 846.40 | 848.30 | 7 |
1989-08-03 | Packing Device Capped w/Cement | 808.30 | 816.30 | 0 |
1989-09-28 | Perforation | 397.50 | 398.20 | 6 |
1989-09-28 | Perforation | 398.80 | 400.00 | 6 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 152 | 0.0 | 0.0 | 0.0 |
1986 | 24 | 0.0 | 0.0 | 0.0 |
1989 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]