If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0124022810000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.027896,"lon":-110.218153,"icon":""}]} |
| Location: 00/10-28-012-02W4/0 | |
| Location Alias: 00/10-28-12-02 W4M | |
| Location Alias 2: 00/10-28-012-02 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 012 | |
| Meridian: 4 | |
| Range: 02 | |
| Section: 28 | |
| County/Municipality: Cypress County | |
| Well Name: CEG MEDHAT 10-28-12-2 | |
| Operator Name: Devon Aog Corporation | |
| License Number: 0015009 | |
| License Date: 1958-03-21 | |
| License Status: RecCertified | |
| Spud Date: 1958-04-22 | |
| Final Drill Date: 1958-04-24 | |
| Well Total Depth: 556.30 m | |
| Surface Hole Latitude: 50.027896 | |
| Surface Hole Longitude: -110.218153 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1958-03-21 | Obtained License |
| 1958-04-24 | Finished Drilling |
| 1958-04-24 | Well Mode changed to Drilled and Cased |
| 1958-04-25 | Production Casing Operation Performed |
| 1958-05-08 | Perforation Treatment Performed - Bullet Perforation |
| 1958-05-08 | Perforation Treatment Performed - Fractured |
| 1958-09-23 | Well Began Production |
| 1958-09-23 | Well Fluid changed to Gas |
| 1958-09-23 | Well Mode changed to Flowing |
| 1959-01-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1959-04-06 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 1959-04-18 | Perforation Treatment Performed - Cement Squeeze |
| 1959-04-22 | Perforation Treatment Performed - Jet Perforation |
| 1959-04-23 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1959-05-05 | Perforation Treatment Performed - Cement Squeeze |
| 1959-05-07 | Perforation Treatment Performed - Fractured |
| 1959-05-07 | Perforation Treatment Performed - Jet Perforation |
| 1960-09-12 | Well Fluid changed to Gas |
| 1960-09-12 | Well Mode changed to Suspended |
| 1969-05-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1969-06-24 | Perforation Treatment Performed - Fractured |
| 1969-07-01 | Well Fluid changed to Gas |
| 1969-07-01 | Well Mode changed to Flowing |
| 1977-09-08 | Well Fluid changed to Gas |
| 1977-09-08 | Well Mode changed to Suspended |
| 1981-08-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1981-08-09 | Well Abandoned |
| 1981-08-09 | Well Fluid changed to Gas |
| 1981-08-09 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1958-05-08 | Bullet Perforation | 521.20 | 527.30 | 13 |
| 1959-05-07 | Fracture | 522.40 | 525.50 | 0 |
| 1969-05-23 | Acid Treatment | 521.80 | 524.30 | 0 |
| 1969-06-24 | Fracture | 521.80 | 524.30 | 0 |
| 1981-08-09 | Packing Device Capped w/Cement | 458.00 | 466.00 | 0 |
| 1958-05-08 | Fracture | 521.20 | 527.30 | 0 |
| 1959-01-01 | Acid Treatment | 521.20 | 527.30 | 0 |
| 1959-04-06 | Hydra Jet Perforation | 529.10 | 529.10 | 0 |
| 1959-04-18 | Cement Squeeze | 521.20 | 529.10 | 0 |
| 1959-04-22 | Perforation | 521.80 | 524.30 | 13 |
| 1959-04-23 | Acid Wash | 521.80 | 524.30 | 0 |
| 1959-05-05 | Cement Squeeze | 521.80 | 524.30 | 0 |
| 1959-05-07 | Perforation | 522.40 | 525.50 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1969 | 4416 | 0.0 | 0.0 | 0.0 |
| 1970 | 8351 | 0.0 | 0.0 | 0.0 |
| 1971 | 8256 | 0.0 | 0.0 | 0.0 |
| 1972 | 7440 | 0.0 | 0.0 | 0.0 |
| 1973 | 4440 | 0.0 | 0.0 | 0.0 |
| 1974 | 7728 | 0.0 | 0.0 | 0.0 |
| 1975 | 8327 | 0.0 | 0.0 | 0.0 |
| 1976 | 5135 | 0.0 | 0.0 | 0.0 |
For data sources see[5]