X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114242811002

Well Details

Well ID: 0114242811002
Loading map...
Location: 00/11-28-011-24W4/2
Location Alias: 00/11-28-11-24 W4M
Location Alias 2: 00/11-28-011-24 W4/02
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 24
Section: 28
County/Municipality: Lethbridge County
Well Name: NEXEN KEHO 11-28-11-24
Operator Name: TORC Oil & Gas Ltd.
License Number: 0428411
License Date: 2010-12-20
License Status: Suspension
Spud Date: 2011-01-17
Final Drill Date: 2011-03-08
Well Total Depth: 3522.00 m
Surface Hole Latitude: 49.933455
Surface Hole Longitude: -113.213073

For data sources see[1][2]

Well History

Date Event
2010-12-20 Obtained License
2011-01-20 Surface Casing Operation Performed
2011-02-12 Direction Drilling Operation Performed - Horizontal
2011-02-27 Intermediate Casing Operation Performed
2011-03-08 Finished Drilling
2011-03-08 Well Mode changed to Drilled and Cased
2011-03-09 Well Log Performed
2011-03-11 Rig Released
2011-03-23 Well Log Performed
2011-03-26 Well Log Performed
2011-03-30 Perforation Treatment Performed - Open-Hole Completion
2011-04-15 Well Log Performed
2011-04-17 Perforation Treatment Performed - Jet Perforation
2011-04-17 Well Log Performed
2011-04-18 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-21 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-04-21 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-27 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-04-28 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-04-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-29 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-04-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-05-01 Perforation Treatment Performed - Multi-Stage Fracture
2011-05-02 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-05-02 Perforation Treatment Performed - Multi-Stage Fracture
2011-05-03 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-05-06 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-05-06 Perforation Treatment Performed - Multi-Stage Fracture
2011-05-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-05-09 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-05-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-05-10 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-05-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-05-11 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-05-11 Perforation Treatment Performed - Fractured
2011-05-12 Perforation Treatment Performed - Jet Perforation
2011-05-14 Perforation Treatment Performed - Jet Perforation
2011-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2011-05-23 Well Began Production
2011-05-23 Well Fluid changed to Crude Oil
2011-05-23 Well Mode changed to Pumping
2011-05-25 Well Log Performed
2013-02-01 Well Fluid changed to Crude Oil
2013-02-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-12 2003.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-30 Open Hole/Barefoot Completion 2371.00 3521.00 0
2011-04-29 Hydra Jet Perforation 3177.50 3177.60 0
2011-04-29 Multi-Stage Fracture 3177.50 3177.60 0
2011-04-29 Hydra Jet Perforation 3131.00 3131.10 0
2011-04-29 Multi-Stage Fracture 3131.00 3131.10 0
2011-04-29 Hydra Jet Perforation 3037.50 3037.60 0
2011-05-01 Multi-Stage Fracture 3037.50 3037.60 0
2011-05-02 Hydra Jet Perforation 2962.10 2962.20 0
2011-05-02 Multi-Stage Fracture 2962.10 2962.20 0
2011-05-03 Hydra Jet Perforation 2881.80 2881.90 0
2011-05-06 Multi-Stage Fracture 2881.80 2881.90 0
2011-04-17 Perforation 3450.80 3450.90 17
2011-05-06 Hydra Jet Perforation 2813.30 2813.40 0
2011-05-08 Multi-Stage Fracture 2813.30 2813.40 0
2011-05-09 Hydra Jet Perforation 2757.00 2757.10 0
2011-05-09 Multi-Stage Fracture 2757.00 2757.10 0
2011-05-10 Hydra Jet Perforation 2700.30 2700.40 0
2011-05-10 Multi-Stage Fracture 2700.30 2700.40 0
2011-05-11 Hydra Jet Perforation 2548.30 2548.40 0
2011-05-11 Fracture 2548.30 2548.40 0
2011-05-12 Perforation 2498.90 2499.00 17
2011-05-14 Perforation 2467.90 2468.00 17
2011-04-18 Multi-Stage Fracture 3450.80 3450.90 0
2011-05-16 Multi-Stage Fracture 2467.90 2468.00 0
2011-04-21 Hydra Jet Perforation 3360.10 3360.20 0
2011-04-21 Multi-Stage Fracture 3360.10 3360.20 0
2011-04-27 Hydra Jet Perforation 3325.40 3325.60 0
2011-04-28 Multi-Stage Fracture 3325.50 3325.60 0
2011-04-28 Hydra Jet Perforation 3253.00 3253.10 0
2011-04-28 Multi-Stage Fracture 3253.00 3253.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 3097 0.0 0.0 0.0
2012 7146 0.0 0.0 0.0

For data sources see[6]

References