X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114171610020

Well Details

Well ID: 0114171610020
Loading map...
Location: 02/10-16-011-17W4/0
Location Alias: 02/10-16-11-17 W4M
Location Alias 2: 02/10-16-011-17 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 17
Section: 16
County/Municipality: Municipal District of Taber
Well Name: HAREX TURIN 10-16-11-17
Operator Name: Devon Canada Corporation
License Number: 0061500
License Date: 1976-12-06
License Status: RecCertified
Spud Date: 1976-12-12
Final Drill Date: 1976-12-17
Well Total Depth: 1053.70 m
Surface Hole Latitude: 49.911738
Surface Hole Longitude: -112.267648

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-12-06 Obtained License
1976-12-15 Drill Stem Test Performed
1976-12-16 Drill Stem Test Performed
1976-12-16 Kick Occurred
1976-12-17 Finished Drilling
1976-12-18 Drill Stem Test Performed
1976-12-18 Production Casing Operation Performed
1976-12-19 Well Mode changed to Drilled and Cased
1984-03-31 Perforation Treatment Performed - Jet Perforation
1984-03-31 Well Log Performed
1984-05-15 Well Began Production
1984-05-15 Well Fluid changed to Gas
1984-05-15 Well Mode changed to Flowing
1984-06-01 Well Fluid changed to Gas
1984-06-01 Well Mode changed to Suspended
1988-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-20 Perforation Treatment Performed - Jet Perforation
1988-02-21 Perforation Treatment Performed - Cement Squeeze
1992-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-31 Plug Back Performed
1992-07-31 Well Abandoned
1992-07-31 Well Fluid changed to Gas
1992-07-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-03-31 Perforation 726.30 727.90 0
1988-02-20 Perforation 735.20 736.20 13
1988-02-20 Acid Treatment 735.20 736.20 0
1988-02-21 Cement Squeeze 726.30 736.20 0
1992-07-31 Packing Device Capped w/Cement 703.00 711.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 82 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-12-16 Kick 1025.60 1025.60

For data sources see[6]

References