X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114171004000

Well Details

Well ID: 0114171004000
Loading map...
Location: 00/04-10-011-17W4/0
Location Alias: 00/04-10-11-17 W4M
Location Alias 2: 00/04-10-011-17 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 17
Section: 10
County/Municipality: Municipal District of Taber
Well Name: SLE TURIN 4-10-11-17
Operator Name: SanLing Energy Ltd.
License Number: 0091705
License Date: 1981-08-14
License Status: Abandoned
Spud Date: 1981-09-08
Final Drill Date: 1981-09-13
Well Total Depth: 1042.00 m
Surface Hole Latitude: 49.888158
Surface Hole Longitude: -112.256072

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-08-14 Obtained License
1981-09-12 Kick Occurred
1981-09-13 Finished Drilling
1981-09-13 Well Log Performed
1981-09-13 Well Mode changed to Drilled and Cased
1981-09-14 Drill Stem Test Performed
1981-09-15 Drill Stem Test Performed
1981-09-16 Drill Stem Test Performed
1981-09-17 Production Casing Operation Performed
1981-11-28 Perforation Treatment Performed - Jet Perforation
1981-12-01 Perforation Treatment Performed - Jet Perforation
1981-12-29 Well Began Production
1981-12-29 Well Fluid changed to Crude Oil
1981-12-29 Well Mode changed to Flowing
1983-09-06 Well Fluid changed to Crude Oil
1983-09-06 Well Mode changed to Pumping
1985-05-05 Perforation Treatment Performed - Jet Perforation
1985-05-05 Well Log Performed
1987-05-06 Well Fluid changed to Crude Oil
1987-05-06 Well Mode changed to Suspended
1987-05-15 Well Log Performed
1987-09-01 Well Began Injection
1987-09-01 Well Fluid changed to Water
1987-09-01 Well Type changed to Disposal
1988-06-13 Well Log Performed
1995-05-01 Well Fluid changed to Water
1995-05-01 Well Mode changed to Suspended
1995-05-01 Well Type changed to Disposal
1996-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-08 Plug Back Performed
1996-08-08 Well Abandoned
1996-08-08 Well Fluid changed to Water
1996-08-08 Well Mode changed to Abandoned
1996-08-08 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-11-28 Perforation 1011.50 1012.50 13
1981-12-01 Perforation 1006.00 1008.50 13
1985-05-05 Perforation 1005.50 1008.50 13
1996-08-08 Packing Device Capped w/Cement 981.00 989.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 72 0.0 0.0 0.0
1982 4572 0.0 0.0 0.0
1983 7502 0.0 0.0 0.0
1984 6846 0.0 0.0 0.0
1985 6657 0.0 0.0 0.0
1986 4184 0.0 0.0 0.0
1987 135 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-09-12 Kick 885.00 885.00

For data sources see[6]

References