X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114161804000

Well Details

Well ID: 0114161804000
Loading map...
Location: 00/04-18-011-16W4/0
Location Alias: 00/04-18-11-16 W4M
Location Alias 2: 00/04-18-011-16 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 16
Section: 18
County/Municipality: Municipal District of Taber
Well Name: CDN-SUP TABER NORTH 4-18-11-16
Operator Name: Canadian Natural Resources Limited
License Number: 0089095
License Date: 1981-02-19
License Status: Suspension
Spud Date: 1981-03-02
Final Drill Date: 1981-03-13
Well Total Depth: 1046.00 m
Surface Hole Latitude: 49.904550
Surface Hole Longitude: -112.186744

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-02-19 Obtained License
1981-03-02 Direction Drilling Operation Performed - 98
1981-03-13 Finished Drilling
1981-03-15 Drill Stem Test Performed
1981-03-16 Production Casing Operation Performed
1981-04-21 Perforation Treatment Performed - Jet Perforation
1981-04-23 Well Mode changed to Drilled and Cased
1985-02-15 Perforation Treatment Performed - Jet Perforation
1985-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-20 Perforation Treatment Performed - Fractured
1990-11-19 Well Began Production
1990-11-19 Well Fluid changed to Gas
1990-11-19 Well Mode changed to Flowing
1991-01-01 Well Fluid changed to Gas
1991-01-01 Well Mode changed to Suspended
1995-02-14 Perforation Treatment Performed - Jet Perforation
1995-02-22 Well Fluid changed to Gas
1995-02-22 Well Mode changed to Flowing
1995-05-01 Well Fluid changed to Gas
1995-05-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1981-03-02 202.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-04-21 Perforation 989.00 993.00 13
1985-02-15 Perforation 985.00 987.00 13
1985-02-18 Acid Treatment 985.00 993.00 0
1985-02-20 Fracture 985.00 993.00 0
1995-02-14 Perforation 978.00 981.50 14
1995-02-14 Perforation 982.50 984.00 14

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 528 0.0 0.0 0.0
1995 189 0.0 0.0 0.0

For data sources see[6]

References