X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114161101000

Well Details

Well ID: 0114161101000
Loading map...
Location: 00/01-11-011-16W4/0
Location Alias: 00/01-11-11-16 W4M
Location Alias 2: 00/01-11-011-16 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 16
Section: 11
County/Municipality: Municipal District of Taber
Well Name: CNRL TABERN 1-11-11-16
Operator Name: Canadian Natural Resources Limited
License Number: 0382376
License Date: 2007-09-26
License Status: Issued
Spud Date: 2007-10-16
Final Drill Date: 2007-10-19
Well Total Depth: 1038.00 m
Surface Hole Latitude: 49.888376
Surface Hole Longitude: -112.075602

For data sources see[1][2]

Well History

Date Event
2007-09-26 Obtained License
2007-10-17 Direction Drilling Operation Performed - Deviate
2007-10-17 Surface Casing Operation Performed
2007-10-19 Finished Drilling
2007-10-19 Well Log Performed
2007-10-19 Well Mode changed to Drilled and Cased
2007-10-20 Production Casing Operation Performed
2007-10-20 Rig Released
2007-10-20 Well Log Performed
2007-10-24 Well Log Performed
2007-10-26 Perforation Treatment Performed - Jet Perforation
2007-10-27 Perforation Treatment Performed - Jet Perforation
2007-10-27 Well Log Performed
2007-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-11-06 Well Log Performed
2008-02-05 Well Began Injection
2008-02-05 Well Fluid changed to Water
2008-02-05 Well Type changed to Injection
2009-01-19 Perforation Treatment Performed - Jet Perforation
2009-01-19 Well Log Performed
2009-01-20 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-10-17 173.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-10-26 Perforation 1016.00 1019.00 17
2007-10-27 Perforation 997.00 1016.00 17
2007-11-04 Acid Treatment 997.00 1019.00 0
2009-01-19 Perforation 1005.00 1007.00 17
2009-01-19 Perforation 1012.50 1014.50 17
2009-01-20 Fracture 997.00 1014.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References