X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114160615000

Well Details

Well ID: 0114160615000
Loading map...
Location: 00/15-06-011-16W4/0
Location Alias: 00/15-06-11-16 W4M
Location Alias 2: 00/15-06-011-16 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 16
Section: 06
County/Municipality: Municipal District of Taber
Well Name: CDN-SUP TABERN 15-6-11-16
Operator Name: ExxonMobil Canada Resources Company
License Number: 0107321
License Date: 1984-05-28
License Status: RecExempt
Spud Date: 1984-05-28
Final Drill Date: 1984-06-01
Well Total Depth: 1018.00 m
Surface Hole Latitude: 49.886247
Surface Hole Longitude: -112.174407

For data sources see[1][2]

Well History

Date Event
1984-05-28 Obtained License
1984-05-29 Surface Casing Operation Performed
1984-06-01 Finished Drilling
1984-06-01 Well Log Performed
1984-06-01 Well Mode changed to Drilled and Cased
1984-06-02 Production Casing Operation Performed
1984-06-02 Rig Released
1984-06-06 Perforation Treatment Performed - Cement Squeeze
1984-06-06 Perforation Treatment Performed - Jet Perforation
1984-06-09 Perforation Treatment Performed - Jet Perforation
1984-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-14 Perforation Treatment Performed - Cement Squeeze
1984-06-18 Perforation Treatment Performed - Abrasa-Jet Perforation
1984-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-21 Well Began Production
1984-06-21 Well Fluid changed to Crude Oil
1984-06-21 Well Mode changed to Pumping
1985-07-01 Well Fluid changed to Crude Oil
1985-07-01 Well Mode changed to Suspended
1990-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-28 Plug Back Performed
1990-10-28 Well Fluid changed to Crude Oil
1990-10-28 Well Mode changed to Abandoned
1990-10-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-06-06 Perforation 650.00 650.30 13
1990-10-28 Packing Device Capped w/Cement 966.00 974.00 0
1984-06-06 Perforation 350.00 350.30 13
1984-06-06 Perforation 230.00 230.10 13
1984-06-06 Cement Squeeze 230.00 650.30 0
1984-06-09 Perforation 978.00 980.00 13
1984-06-11 Acid Treatment 978.00 980.00 0
1984-06-14 Cement Squeeze 978.00 980.00 0
1984-06-18 Hydra Jet Perforation 978.00 979.50 0
1984-06-20 Acid Treatment 978.00 979.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 2176 0.0 0.0 0.0
1985 310 0.0 0.0 0.0

For data sources see[5]

References