X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114160105060

Well Details

Well ID: 0114160105060
Loading map...
Location: 06/05-01-011-16W4/0
Location Alias: 06/05-01-11-16 W4M
Location Alias 2: 06/05-01-011-16 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 16
Section: 01
County/Municipality: Municipal District of Taber
Well Name: CNRL TABERN 5-1-11-16
Operator Name: Canadian Natural Resources Limited
License Number: 0398128
License Date: 2008-06-30
License Status: Issued
Spud Date: 2008-07-03
Final Drill Date: 2008-07-07
Well Total Depth: 1060.00 m
Surface Hole Latitude: 49.880013
Surface Hole Longitude: -112.072719

For data sources see[1][2]

Well History

Date Event
2008-06-06 Well Log Performed
2008-06-30 Obtained License
2008-07-04 Surface Casing Operation Performed
2008-07-05 Direction Drilling Operation Performed - Deviate
2008-07-06 Well Log Performed
2008-07-07 Finished Drilling
2008-07-07 Production Casing Operation Performed
2008-07-07 Rig Released
2008-07-07 Well Mode changed to Drilled and Cased
2008-07-13 Perforation Treatment Performed - Jet Perforation
2008-07-13 Well Log Performed
2008-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-14 Perforation Treatment Performed - Jet Perforation
2008-07-15 Perforation Treatment Performed - Jet Perforation
2008-07-15 Well Log Performed
2008-07-17 Well Began Production
2008-07-17 Well Fluid changed to Crude Oil
2008-07-17 Well Mode changed to Pumping
2014-10-31 Well Fluid changed to Crude Oil
2014-10-31 Well Mode changed to Suspended
2017-01-12 Well Fluid changed to Crude Oil
2017-01-12 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-07-05 200.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-07-13 Perforation 1026.20 1026.30 2
2008-07-14 Packing Device Capped w/Cement 1025.00 1025.30 0
2008-07-14 Perforation 1018.80 1021.00 17
2008-07-15 Perforation 990.60 991.40 17
2008-07-15 Perforation 986.00 987.50 17
2008-07-15 Perforation 984.00 985.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 3964 0.0 0.0 0.0
2009 8599 0.0 0.0 0.0
2010 8108 0.0 0.0 0.0
2011 8261 0.0 0.0 0.0
2012 5720 0.0 0.0 0.0
2013 216 0.0 0.0 0.0
2017 8437 0.0 0.0 0.0
2018 8642 0.0 0.0 0.0
2019 8617 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References