X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114141403022

Well Details

Well ID: 0114141403022
Loading map...
Location: 02/03-14-011-14W4/2
Location Alias: 02/03-14-11-14 W4M
Location Alias 2: 02/03-14-011-14 W4/02
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 14
Section: 14
County/Municipality: Municipal District of Taber
Well Name: RENAISSANCE 3B GRDFKS 3-14-11-14
Operator Name: Husky Oil Operations Limited
License Number: 0193821
License Date: 1996-11-21
License Status: RecCertified
Spud Date: 1997-05-02
Final Drill Date: 1997-05-11
Well Total Depth: 1061.00 m
Surface Hole Latitude: 49.900914
Surface Hole Longitude: -111.817440

For data sources see[1][2]

Well History

Date Event
1996-11-21 Obtained License
1997-05-04 Direction Drilling Operation Performed - Deviate
1997-05-04 Surface Casing Operation Performed
1997-05-08 Direction Drilling Operation Performed - Deviate
1997-05-11 Finished Drilling
1997-05-11 Well Log Performed
1997-05-12 Production Casing Operation Performed
1997-05-12 Rig Released
1997-05-20 Perforation Treatment Performed - Jet Perforation
1997-06-19 Well Log Performed
1997-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-05 Perforation Treatment Performed - Jet Perforation
1997-08-05 Perforation Treatment Performed - Remedial Casing
1997-08-05 Plug Back Performed
1997-08-06 Perforation Treatment Performed - Jet Perforation
1997-08-06 Perforation Treatment Performed - Remedial Casing
1998-08-10 Well Abandoned
1998-08-10 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-05-04 329.00 Deviate (5 - 79 degrees)
1997-05-08 329.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-05-20 Perforation 1027.50 1028.50 13
1997-05-20 Perforation 1020.00 1022.50 13
1997-08-05 Packing Device Capped w/Cement 1007.00 1015.00 0
1997-08-05 Perforation 295.00 295.30 13
1997-08-05 Remedial Casing Cementing 295.00 295.30 0
1997-08-06 Perforation 225.00 225.30 13
1997-08-06 Remedial Casing Cementing 225.00 225.30 0

For data sources see[5]



References