X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114131508000

Well Details

Well ID: 0114131508000
Loading map...
Location: 00/08-15-011-13W4/0
Location Alias: 00/08-15-11-13 W4M
Location Alias 2: 00/08-15-011-13 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 13
Section: 15
County/Municipality: Municipal District of Taber
Well Name: SLE BI 8-15-11-13
Operator Name: SanLing Energy Ltd.
License Number: 0045130
License Date: 1973-02-15
License Status: Abandoned
Spud Date: 1973-02-16
Final Drill Date: 1973-02-19
Well Total Depth: 941.20 m
Surface Hole Latitude: 49.907069
Surface Hole Longitude: -111.691970

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-02-15 Obtained License
1973-02-19 Finished Drilling
1973-02-19 Well Mode changed to Drilled and Cased
1973-02-21 Perforation Treatment Performed - Abrasa-Jet Perforation
1973-02-21 Production Casing Operation Performed
1973-03-01 Well Began Production
1973-03-01 Well Fluid changed to Crude Oil
1973-03-01 Well Mode changed to Flowing
1974-04-19 Perforation Treatment Performed - Cement Squeeze
1974-04-19 Perforation Treatment Performed - Jet Perforation
1974-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-04-24 Perforation Treatment Performed - Jet Perforation
1985-08-13 Perforation Treatment Performed - Jet Perforation
1985-08-13 Well Log Performed
1985-08-15 Perforation Treatment Performed - Jet Perforation
1985-09-14 Well Fluid changed to Crude Oil
1985-09-14 Well Mode changed to Pumping
1986-10-01 Well Fluid changed to Crude Oil
1986-10-01 Well Mode changed to Suspended
1993-11-12 Well Log Performed
1993-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-13 Perforation Treatment Performed - Jet Perforation
1993-11-13 Plug Back Performed
1993-11-13 Well Log Performed
1993-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-14 Plug Back Performed
1993-11-14 Well Abandoned
1993-11-14 Well Fluid changed to Crude Oil
1993-11-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-02-21 Hydra Jet Perforation 891.70 894.10 0
1993-11-13 Perforation 632.00 634.00 13
1993-11-13 Perforation 641.90 645.00 13
1993-11-14 Packing Device Capped w/Cement 612.00 620.00 0
1973-02-21 Hydra Jet Perforation 897.30 898.50 10
1974-04-19 Perforation 901.00 902.20 10
1974-04-19 Cement Squeeze 901.00 902.20 0
1974-04-23 Acid Treatment 891.70 898.50 0
1974-04-24 Perforation 897.60 898.60 13
1985-08-13 Perforation 897.60 898.60 14
1985-08-15 Perforation 892.70 894.20 14
1993-11-13 Packing Device Capped w/Cement 875.00 883.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 6791 0.0 0.0 0.0
1974 2640 0.0 0.0 0.0
1985 2289 0.0 0.0 0.0
1986 1022 0.0 0.0 0.0

For data sources see[5]

References