X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114131215002

Well Details

Well ID: 0114131215002
Loading map...
Location: 00/15-12-011-13W4/2
Location Alias: 00/15-12-11-13 W4M
Location Alias 2: 00/15-12-011-13 W4/02
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 13
Section: 12
County/Municipality: Municipal District of Taber
Well Name: PEL BI 15-12-11-13
Operator Name: NEO Exploration Inc.
License Number: 0321744
License Date: 2004-12-15
License Status: Abandoned
Spud Date: 2004-12-23
Final Drill Date: 2004-12-29
Well Total Depth: 1252.00 m
Surface Hole Latitude: 49.893899
Surface Hole Longitude: -111.650865

For data sources see[1][2]

Well History

Date Event
1994-11-22 Direction Drilling Operation Performed - Deviate
2004-12-15 Obtained License
2004-12-29 Finished Drilling
2004-12-29 Perforation Treatment Performed - Jet Perforation
2004-12-29 Well Mode changed to Drilled and Cased
2004-12-30 Perforation Treatment Performed - Fractured
2005-01-01 Rig Released
2005-08-29 Well Began Production
2005-08-29 Well Fluid changed to Gas
2005-08-29 Well Mode changed to Flowing
2008-11-16 Perforation Treatment Performed - Jet Perforation
2008-11-18 Perforation Treatment Performed - Jet Perforation
2008-11-23 Perforation Treatment Performed - Jet Perforation
2008-11-25 Perforation Treatment Performed - Jet Perforation
2009-09-15 Well Fluid changed to Gas
2009-09-15 Well Mode changed to Suspended
2017-11-05 Well Log Performed
2017-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-11-06 Plug Back Performed
2017-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-11-08 Plug Back Performed
2017-11-08 Well Fluid changed to Gas
2017-11-08 Well Mode changed to Abandoned Zone
2019-01-19 Well Abandoned
2019-01-19 Well Fluid changed to Gas
2019-01-19 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-11-22 190.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-12-29 Perforation 781.00 786.00 17
2017-11-06 Packing Device Capped w/Cement 754.00 762.00 0
2017-11-08 Packing Device Capped w/Cement 692.50 700.50 0
2017-11-08 Packing Device Capped w/Cement 608.00 616.00 0
2017-11-08 Packing Device Capped w/Cement 383.50 391.50 0
2004-12-29 Perforation 777.00 781.00 17
2004-12-30 Fracture 781.00 786.00 0
2004-12-30 Fracture 777.00 781.00 0
2008-11-16 Perforation 715.20 718.20 17
2008-11-18 Perforation 627.00 630.00 13
2008-11-23 Perforation 483.00 484.50 13
2008-11-25 Perforation 411.00 414.00 13
2008-11-25 Perforation 399.00 401.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 2965 0.0 0.0 0.0
2006 8287 0.0 0.0 0.0
2007 7713 0.0 0.0 0.0
2008 6723 0.0 0.0 0.0
2009 4142 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-09 No Incident Encountered 0.00 0.00
2018-10-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References