X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114080506000

Well Details

Well ID: 0114080506000
Loading map...
Location: 00/06-05-011-08W4/0
Location Alias: 00/06-05-11-08 W4M
Location Alias 2: 00/06-05-011-08 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 08
Section: 05
County/Municipality: County of Forty Mile No. 8
Well Name: CVE MEDHAT 6-5-11-8
Operator Name: Cenovus Energy Inc.
License Number: 0044996
License Date: 1973-02-02
License Status: Abandoned
Spud Date: 1973-02-07
Final Drill Date: 1973-02-14
Well Total Depth: 992.70 m
Surface Hole Latitude: 49.877667
Surface Hole Longitude: -111.067066

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-02-02 Obtained License
1973-02-10 Drill Stem Test Performed
1973-02-14 Finished Drilling
1973-02-15 Drill Stem Test Performed
1973-02-16 Drill Stem Test Performed
1973-02-17 Production Casing Operation Performed
1973-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-24 Perforation Treatment Performed - Fractured
1973-02-24 Perforation Treatment Performed - Jet Perforation
1973-10-30 Well Mode changed to Drilled and Cased
1980-12-09 Well Began Production
1980-12-09 Well Fluid changed to Gas
1980-12-09 Well Mode changed to Flowing
1994-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-22 Plug Back Performed
1994-09-22 Well Fluid changed to Gas
1994-09-22 Well Log Performed
1994-09-22 Well Mode changed to Abandoned
1994-10-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-02-24 Perforation 604.70 605.00 3
1973-02-24 Perforation 605.90 606.20 3
1973-02-24 Perforation 607.80 608.10 3
1973-02-24 Perforation 611.70 612.00 3
1973-02-24 Perforation 614.50 614.80 3
1973-02-24 Perforation 620.00 620.00 3
1973-02-24 Acid Treatment 604.70 620.00 0
1973-02-24 Fracture 604.70 620.00 0
1994-09-22 Packing Device Capped w/Cement 585.00 593.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 518 0.0 0.0 0.0
1981 7752 0.0 0.0 0.0
1982 7629 0.0 0.0 0.0
1983 7780 0.0 0.0 0.0
1984 7854 0.0 0.0 0.0
1985 8191 0.0 0.0 0.0
1986 6560 0.0 0.0 0.0
1987 7127 0.0 0.0 0.0
1988 8346 0.0 0.0 0.0
1989 8090 0.0 0.0 0.0
1990 8136 0.0 0.0 0.0
1991 7206 0.0 0.0 0.0
1992 4495 0.0 0.0 0.0

For data sources see[5]

References