If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0114051210002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.895349,"lon":-110.55697,"icon":""}]} |
Location: 00/10-12-011-05W4/2 | |
Location Alias: 00/10-12-11-05 W4M | |
Location Alias 2: 00/10-12-011-05 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 05 | |
Section: 12 | |
County/Municipality: Cypress County | |
Well Name: SLE MEDHAT 10-12-11-5 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0059720 | |
License Date: 1976-08-12 | |
License Status: Abandoned | |
Spud Date: 1976-09-06 | |
Final Drill Date: 1976-09-08 | |
Well Total Depth: 826.00 m | |
Surface Hole Latitude: 49.895349 | |
Surface Hole Longitude: -110.556970 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-08-12 | Obtained License |
1976-09-08 | Finished Drilling |
1976-09-08 | Well Log Performed |
1976-09-08 | Well Mode changed to Drilled and Cased |
1976-09-09 | Production Casing Operation Performed |
1976-09-30 | Perforation Treatment Performed - Jet Perforation |
1979-06-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-06-20 | Perforation Treatment Performed - Jet Perforation |
1979-06-22 | Perforation Treatment Performed - Fractured |
1979-08-16 | Well Began Production |
1979-08-16 | Well Fluid changed to Gas |
1979-08-16 | Well Mode changed to Flowing |
1981-07-04 | Well Fluid changed to Gas |
1981-07-04 | Well Mode changed to Suspended |
1997-08-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-08-18 | Plug Back Performed |
1997-08-18 | Well Fluid changed to Gas |
1997-08-18 | Well Mode changed to Abandoned Zone |
1997-08-23 | Well Abandoned |
1997-08-23 | Well Fluid changed to Gas |
1997-08-23 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-09-30 | Perforation | 773.60 | 773.90 | 7 |
1979-06-20 | Packing Device Capped w/Cement | 758.00 | 768.00 | 0 |
1979-06-20 | Perforation | 455.70 | 457.20 | 7 |
1979-06-20 | Perforation | 458.70 | 459.60 | 7 |
1979-06-22 | Fracture | 455.70 | 459.60 | 0 |
1997-08-18 | Packing Device Capped w/Cement | 438.80 | 446.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 3256 | 0.0 | 0.0 | 0.0 |
1980 | 7575 | 0.0 | 0.0 | 0.0 |
1981 | 1437 | 0.0 | 0.0 | 0.0 |
For data sources see[5]