X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104270208000

Well Details

Well ID: 0104270208000
Loading map...
Location: 00/08-02-010-27W4/0
Location Alias: 00/08-02-10-27 W4M
Location Alias 2: 00/08-02-010-27 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 27
Section: 02
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: CZAR ET AL MUD LAKE 8-2-10-27
Operator Name: Canadian Natural Resources Limited
License Number: 0084557
License Date: 1980-07-29
License Status: RecCertified
Spud Date: 1980-08-17
Final Drill Date: 1980-10-12
Well Total Depth: 2940.00 m
Surface Hole Latitude: 49.792816
Surface Hole Longitude: -113.552112

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-29 Obtained License
1980-09-01 Lost Circulation Occurred
1980-09-12 Lost Circulation Occurred
1980-10-12 Finished Drilling
1980-10-15 Lost Circulation Occurred
1980-11-20 Production Casing Operation Performed
1981-01-14 Perforation Treatment Performed - Jet Perforation
1981-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-01-28 Perforation Treatment Performed - Jet Perforation
1981-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-01-30 Perforation Treatment Performed - Jet Perforation
1981-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-02-01 Perforation Treatment Performed - Jet Perforation
1981-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-02-14 Perforation Treatment Performed - Jet Perforation
1981-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-17 Perforation Treatment Performed - Jet Perforation
1981-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-02-18 Well Abandoned
1981-02-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-01-14 Perforation 2902.00 2905.00 13
1981-02-01 Perforation 2506.00 2509.00 13
1981-02-02 Acid Treatment 2506.00 2509.00 0
1981-02-12 Acid Treatment 2506.00 2509.00 0
1981-02-14 Packing Device Capped w/Cement 2498.00 2502.00 0
1981-02-14 Perforation 2491.00 2492.00 0
1981-02-14 Perforation 2493.00 2495.00 0
1981-02-15 Acid Treatment 2491.00 2495.00 0
1981-02-16 Packing Device Capped w/Cement 2477.00 2485.00 0
1981-02-17 Perforation 2392.00 2394.50 13
1981-02-17 Acid Treatment 2392.00 2394.50 0
1981-01-26 Acid Treatment 2902.00 2905.00 0
1981-02-18 Packing Device Capped w/Cement 2380.00 2388.00 0
1981-01-28 Packing Device Capped w/Cement 2888.00 2896.00 0
1981-01-28 Perforation 2546.00 2549.00 13
1981-01-29 Acid Treatment 2546.00 2549.00 0
1981-01-30 Packing Device Capped w/Cement 2535.00 2543.00 0
1981-01-30 Perforation 2522.00 2524.00 13
1981-01-31 Acid Treatment 2522.00 2524.00 0
1981-02-01 Packing Device Capped w/Cement 2511.00 2519.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-09-01 Lost Circulation 1517.00 1517.00
1980-09-12 Lost Circulation 2212.00 2226.00
1980-10-15 Lost Circulation 2940.00 2940.00

For data sources see[5]

References