If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0104191308020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.819249,"lon":-112.448472,"icon":""}]} |
| Location: 02/08-13-010-19W4/0 | |
| Location Alias: 02/08-13-10-19 W4M | |
| Location Alias 2: 02/08-13-010-19 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 010 | |
| Meridian: 4 | |
| Range: 19 | |
| Section: 13 | |
| County/Municipality: Lethbridge County | |
| Well Name: ACANTHUS ET AL TURIN 8-13-10-19 | |
| Operator Name: Baytex Energy Ltd. | |
| License Number: 0110698 | |
| License Date: 1984-11-12 | |
| License Status: RecCertified | |
| Spud Date: 1984-11-16 | |
| Final Drill Date: 1984-11-22 | |
| Well Total Depth: 1100.00 m | |
| Surface Hole Latitude: 49.819249 | |
| Surface Hole Longitude: -112.448472 |
| Date | Event |
|---|---|
| 1984-11-12 | Obtained License |
| 1984-11-17 | Surface Casing Operation Performed |
| 1984-11-22 | Finished Drilling |
| 1984-11-22 | Well Log Performed |
| 1984-11-22 | Well Mode changed to Drilled and Cased |
| 1984-11-23 | Drill Stem Test Performed |
| 1984-11-24 | Production Casing Operation Performed |
| 1984-11-24 | Rig Released |
| 1984-12-07 | Perforation Treatment Performed - Jet Perforation |
| 1984-12-07 | Well Log Performed |
| 1984-12-09 | Well Began Production |
| 1984-12-09 | Well Fluid changed to Crude Oil |
| 1984-12-09 | Well Mode changed to Pumping |
| 1992-03-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1992-03-20 | Plug Back Performed |
| 1992-03-20 | Well Fluid changed to Crude Oil |
| 1992-03-20 | Well Log Performed |
| 1992-03-20 | Well Mode changed to Abandoned |
| 1992-03-24 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1984-12-07 | Perforation | 1064.50 | 1066.00 | 13 |
| 1992-03-20 | Packing Device Capped w/Cement | 1052.00 | 1060.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1984 | 510 | 0.0 | 0.0 | 0.0 |
| 1985 | 6892 | 0.0 | 0.0 | 0.0 |
| 1986 | 7164 | 0.0 | 0.0 | 0.0 |
| 1987 | 7614 | 0.0 | 0.0 | 0.0 |
| 1988 | 8220 | 0.0 | 0.0 | 0.0 |
| 1989 | 7998 | 0.0 | 0.0 | 0.0 |
| 1990 | 7798 | 0.0 | 0.0 | 0.0 |
| 1991 | 6342 | 0.0 | 0.0 | 0.0 |
For data sources see[5]