If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0104181202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.800752,"lon":-112.314529,"icon":""}]} |
Location: 00/02-12-010-18W4/0 | |
Location Alias: 00/02-12-10-18 W4M | |
Location Alias 2: 00/02-12-010-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 010 | |
Meridian: 4 | |
Range: 18 | |
Section: 12 | |
County/Municipality: Municipal District of Taber | |
Well Name: PROVIDENT TURIN 2-12-10-18 | |
Operator Name: Pembina NGL Corporation | |
License Number: 0181612 | |
License Date: 1995-10-24 | |
License Status: RecCertified | |
Spud Date: 1995-11-05 | |
Final Drill Date: 1995-11-08 | |
Well Total Depth: 1043.00 m | |
Surface Hole Latitude: 49.800752 | |
Surface Hole Longitude: -112.314529 |
Date | Event |
---|---|
1995-10-24 | Obtained License |
1995-11-06 | Surface Casing Operation Performed |
1995-11-08 | Finished Drilling |
1995-11-08 | Production Casing Operation Performed |
1995-11-08 | Well Log Performed |
1995-11-08 | Well Mode changed to Drilled and Cased |
1995-11-09 | Rig Released |
1995-11-20 | Perforation Treatment Performed - Jet Perforation |
1995-11-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-11-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-11-22 | Plug Back Performed |
1996-01-22 | Perforation Treatment Performed - Jet Perforation |
1996-01-22 | Perforation Treatment Performed - Selective Jet Perforations |
1996-05-28 | Well Began Production |
1996-05-28 | Well Fluid changed to Gas |
1996-05-28 | Well Mode changed to Flowing |
1997-06-24 | Well Fluid changed to Gas |
1997-06-24 | Well Mode changed to Suspended |
1997-09-01 | Well Fluid changed to Gas |
1997-09-01 | Well Mode changed to Flowing |
1998-04-01 | Well Fluid changed to Gas |
1998-04-01 | Well Mode changed to Suspended |
2001-07-03 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2001-07-03 | Plug Back Performed |
2004-05-27 | Perforation Treatment Performed - Cement Plug |
2004-05-27 | Plug Back Performed |
2004-05-27 | Well Fluid changed to Gas |
2004-05-27 | Well Mode changed to Abandoned Zone |
2004-06-04 | Well Abandoned |
2004-06-04 | Well Fluid changed to Gas |
2004-06-04 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-11-20 | Perforation | 1014.00 | 1017.00 | 13 |
1995-11-21 | Acid Treatment | 1014.00 | 1017.00 | 0 |
1995-11-22 | Packing Device Capped w/Cement | 1006.00 | 1009.00 | 0 |
1996-01-22 | Selective Jet Perforations | 993.50 | 994.00 | 2 |
1996-01-22 | Perforation | 992.50 | 995.00 | 13 |
1996-01-22 | Perforation | 996.00 | 997.00 | 13 |
2001-07-03 | Bridge Plug, No Cement | 980.00 | 981.00 | 0 |
2004-05-27 | Cement Plug | 972.00 | 980.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 1268 | 0.0 | 0.0 | 0.0 |
1997 | 4652 | 0.0 | 0.0 | 0.0 |
For data sources see[5]