X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104171216000

Well Details

Well ID: 0104171216000
Loading map...
Location: 00/16-12-010-17W4/0
Location Alias: 00/16-12-10-17 W4M
Location Alias 2: 00/16-12-010-17 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 17
Section: 12
County/Municipality: Municipal District of Taber
Well Name: RENAISSANCE TABER 16-12-10-17
Operator Name: Canadian Natural Resources Limited
License Number: 0151528
License Date: 1992-01-27
License Status: Issued
Spud Date: 1992-01-29
Final Drill Date: 1992-02-06
Well Total Depth: 1095.00 m
Surface Hole Latitude: 49.817364
Surface Hole Longitude: -112.175375

For data sources see[1][2]

Well History

Date Event
1992-01-27 Obtained License
1992-01-30 Surface Casing Operation Performed
1992-01-31 Direction Drilling Operation Performed - Deviate
1992-02-01 Well Log Performed
1992-02-06 Finished Drilling
1992-02-06 Well Mode changed to Drilled and Cased
1992-02-07 Well Log Performed
1992-02-08 Production Casing Operation Performed
1992-02-08 Rig Released
1992-02-11 Well Log Performed
1992-02-12 Perforation Treatment Performed - Jet Perforation
1992-02-12 Well Log Performed
1992-02-16 Well Began Production
1992-02-16 Well Fluid changed to Crude Oil
1992-02-16 Well Mode changed to Pumping
2006-09-18 Perforation Treatment Performed - Jet Perforation
2006-09-18 Well Log Performed
2009-03-12 Well Log Performed
2009-03-29 Well Log Performed
2009-03-30 Perforation Treatment Performed - Jet Perforation
2009-03-30 Well Log Performed
2009-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-04-05 Well Log Performed
2009-05-01 Well Began Injection
2009-05-01 Well Fluid changed to Water
2009-05-01 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-01-31 190.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-02-12 Perforation 1043.00 1047.00 13
1992-02-12 Perforation 1049.00 1051.50 13
2006-09-18 Perforation 1054.50 1058.00 17
2009-03-30 Perforation 1060.00 1065.00 17
2009-03-30 Perforation 1066.00 1071.00 17
2009-04-02 Acid Treatment 1043.00 1071.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 7503 0.0 0.0 0.0
1993 8412 0.0 0.0 0.0
1994 8669 0.0 0.0 0.0
1995 8688 0.0 0.0 0.0
1996 8622 0.0 0.0 0.0
1997 8669 0.0 0.0 0.0
1998 8728 0.0 0.0 0.0
1999 8594 0.0 0.0 0.0
2000 8746 0.0 0.0 0.0
2001 8667 0.0 0.0 0.0
2002 8701 0.0 0.0 0.0
2003 7497 0.0 0.0 0.0
2004 8711 0.0 0.0 0.0
2005 8262 0.0 0.0 0.0
2006 8285 0.0 0.0 0.0
2007 8420 0.0 0.0 0.0
2008 8445 0.0 0.0 0.0
2009 2090 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References