X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104170201002

Well Details

Well ID: 0104170201002
Loading map...
Location: 00/01-02-010-17W4/2
Location Alias: 00/01-02-10-17 W4M
Location Alias 2: 00/01-02-010-17 W4/02
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 17
Section: 02
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 1-2-10-17
Operator Name: Canadian Natural Resources Limited
License Number: 0170004
License Date: 1994-08-30
License Status: Amended
Spud Date: 1994-11-14
Final Drill Date: 1994-11-25
Well Total Depth: 1110.00 m
Surface Hole Latitude: 49.790435
Surface Hole Longitude: -112.197708

For data sources see[1][2]

Well History

Date Event
1994-08-30 Obtained License
1994-11-15 Surface Casing Operation Performed
1994-11-22 Direction Drilling Operation Performed - Deviate
1994-11-25 Finished Drilling
1994-11-25 Well Log Performed
1994-11-25 Well Mode changed to Drilled and Cased
1994-11-26 Production Casing Operation Performed
1994-11-26 Rig Released
1994-12-09 Well Log Performed
1994-12-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-12-19 Perforation Treatment Performed - Jet Perforation
1994-12-19 Plug Back Performed
1994-12-22 Well Began Production
1994-12-22 Well Fluid changed to Crude Oil
1994-12-22 Well Mode changed to Pumping
1995-05-18 Perforation Treatment Performed - Jet Perforation
2006-11-23 Well Log Performed
2007-07-01 Well Fluid changed to Crude Oil
2007-07-01 Well Mode changed to Suspended
2009-11-23 Well Log Performed
2009-12-01 Perforation Treatment Performed - Chemical Squeeze
2009-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-12-03 Well Log Performed
2010-11-01 Well Began Injection
2010-11-01 Well Fluid changed to Water
2010-11-01 Well Type changed to Injection
2011-10-29 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-11-22 327.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-12-19 Perforation 1095.00 1099.00 13
1994-12-19 Packing Device Capped w/Cement 1090.00 1093.00 0
1994-12-19 Perforation 1069.00 1075.00 13
1994-12-19 Perforation 1076.00 1079.00 13
1995-05-18 Perforation 1080.00 1082.00 13
2009-12-01 Chemical Squeeze 1069.00 1082.00 0
2009-12-02 Acid Treatment 1069.00 1082.00 0
2011-10-29 Fracture 1069.00 1082.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 276 0.0 0.0 0.0
1995 8532 0.0 0.0 0.0
1996 8724 0.0 0.0 0.0
1997 8492 0.0 0.0 0.0
1998 8496 0.0 0.0 0.0
1999 8725 0.0 0.0 0.0
2000 8483 0.0 0.0 0.0
2001 6850 0.0 0.0 0.0
2002 8584 0.0 0.0 0.0
2003 8401 0.0 0.0 0.0
2004 7719 0.0 0.0 0.0
2005 8695 0.0 0.0 0.0
2006 3585 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References