If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0104163613030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.87261,"lon":-112.058183,"icon":""}]} |
Location: 03/13-36-010-16W4/0 | |
Location Alias: 03/13-36-10-16 W4M | |
Location Alias 2: 03/13-36-010-16 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 010 | |
Meridian: 4 | |
Range: 16 | |
Section: 36 | |
County/Municipality: Municipal District of Taber | |
Well Name: CNRL 13D TABERN 13-36-10-16 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0190910 | |
License Date: 1996-08-28 | |
License Status: Abandoned | |
Spud Date: 1996-10-19 | |
Final Drill Date: 1996-10-24 | |
Well Total Depth: 1025.00 m | |
Surface Hole Latitude: 49.872610 | |
Surface Hole Longitude: -112.058183 |
Date | Event |
---|---|
1996-08-28 | Obtained License |
1996-10-20 | Surface Casing Operation Performed |
1996-10-21 | Direction Drilling Operation Performed - Deviate |
1996-10-21 | Kick Occurred |
1996-10-22 | Kick Occurred |
1996-10-24 | Finished Drilling |
1996-10-24 | Well Log Performed |
1996-10-24 | Well Mode changed to Drilled and Cased |
1996-10-25 | Production Casing Operation Performed |
1996-10-25 | Rig Released |
1996-10-30 | Well Log Performed |
1996-11-16 | Perforation Treatment Performed - Jet Perforation |
1996-11-30 | Perforation Treatment Performed - Cement Squeeze |
1996-12-03 | Perforation Treatment Performed - Jet Perforation |
1996-12-04 | Perforation Treatment Performed - Cement Squeeze |
1996-12-06 | Perforation Treatment Performed - Jet Perforation |
1996-12-08 | Perforation Treatment Performed - Jet Perforation |
1996-12-17 | Well Began Production |
1996-12-17 | Well Fluid changed to Crude Oil |
1996-12-17 | Well Mode changed to Pumping |
2003-08-31 | Well Fluid changed to Crude Oil |
2003-08-31 | Well Mode changed to Suspended |
2008-02-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-02-25 | Plug Back Performed |
2008-02-25 | Well Fluid changed to Crude Oil |
2008-02-25 | Well Log Performed |
2008-02-25 | Well Mode changed to Abandoned Zone |
2008-02-26 | Perforation Treatment Performed - Jet Perforation |
2008-02-26 | Well Log Performed |
2008-03-03 | Perforation Treatment Performed - Fractured |
2009-08-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-08-29 | Plug Back Performed |
2009-08-29 | Well Log Performed |
2009-09-16 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-10-21 | 241.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-11-16 | Perforation | 966.40 | 967.60 | 17 |
1996-12-08 | Perforation | 966.40 | 967.60 | 17 |
2008-02-25 | Packing Device Capped w/Cement | 952.00 | 960.00 | 0 |
2008-02-26 | Perforation | 596.00 | 600.00 | 17 |
2008-03-03 | Fracture | 596.00 | 600.00 | 0 |
2009-08-29 | Packing Device Capped w/Cement | 582.00 | 590.00 | 0 |
1996-11-16 | Perforation | 973.50 | 974.50 | 17 |
1996-11-16 | Perforation | 976.00 | 978.00 | 17 |
1996-11-16 | Perforation | 979.50 | 985.00 | 17 |
1996-11-16 | Perforation | 985.80 | 986.80 | 17 |
1996-11-30 | Cement Squeeze | 976.00 | 986.80 | 0 |
1996-12-03 | Perforation | 973.50 | 974.50 | 17 |
1996-12-04 | Cement Squeeze | 966.40 | 974.50 | 0 |
1996-12-06 | Perforation | 973.50 | 974.50 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 456 | 0.0 | 0.0 | 0.0 |
1997 | 7018 | 0.0 | 0.0 | 0.0 |
1998 | 8720 | 0.0 | 0.0 | 0.0 |
1999 | 8213 | 0.0 | 0.0 | 0.0 |
2000 | 8332 | 0.0 | 0.0 | 0.0 |
2001 | 8101 | 0.0 | 0.0 | 0.0 |
2002 | 2881 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1996-10-21 | Kick | 370.00 | 370.00 |
1996-10-22 | Kick | 635.00 | 635.00 |
For data sources see[7]