X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104163502000

Well Details

Well ID: 0104163502000
Loading map...
Location: 00/02-35-010-16W4/0
Location Alias: 00/02-35-10-16 W4M
Location Alias 2: 00/02-35-010-16 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 16
Section: 35
County/Municipality: Municipal District of Taber
Well Name: CNRL TABERN 2-35-10-16
Operator Name: Canadian Natural Resources Limited
License Number: 0075277
License Date: 1979-04-19
License Status: Issued
Spud Date: 1979-04-19
Final Drill Date: 1979-04-26
Well Total Depth: 1000.00 m
Surface Hole Latitude: 49.861853
Surface Hole Longitude: -112.070000

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-04-19 Obtained License
1979-04-26 Finished Drilling
1979-04-26 Well Log Performed
1979-04-26 Well Mode changed to Drilled and Cased
1979-04-27 Drill Stem Test Performed
1979-04-28 Production Casing Operation Performed
1979-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-03 Perforation Treatment Performed - Jet Perforation
1979-05-10 Well Began Production
1979-05-10 Well Fluid changed to Crude Oil
1979-05-10 Well Mode changed to Flowing
1979-07-25 Perforation Treatment Performed - Cement Squeeze
1979-07-27 Perforation Treatment Performed - Abrasa-Jet Perforation
1979-09-24 Perforation Treatment Performed - Acid Wash - No Pressure
1980-03-20 Well Fluid changed to Crude Oil
1980-03-20 Well Mode changed to Pumping
1986-01-27 Perforation Treatment Performed - Jet Perforation
1986-01-27 Well Log Performed
1988-03-15 Well Log Performed
1988-03-16 Perforation Treatment Performed - Cement Squeeze
1988-03-16 Perforation Treatment Performed - Jet Perforation
1988-03-16 Well Log Performed
1994-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-29 Perforation Treatment Performed - Jet Perforation
1994-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-30 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-05-03 Perforation 947.50 950.00 7
1994-08-29 Perforation 947.50 950.00 13
1994-08-31 Acid Treatment 947.50 950.00 0
1997-09-30 Fracture 947.50 950.00 0
1979-05-03 Acid Treatment 947.50 950.00 0
1979-07-25 Cement Squeeze 947.50 950.00 0
1979-07-27 Hydra Jet Perforation 947.50 949.00 0
1979-09-24 Acid Wash 947.50 949.00 0
1986-01-27 Perforation 947.50 950.00 13
1988-03-16 Perforation 132.00 133.00 14
1988-03-16 Cement Squeeze 132.00 133.00 0
1994-08-26 Acid Treatment 947.50 950.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 4080 0.0 0.0 0.0
1980 6191 0.0 0.0 0.0
1981 4205 0.0 0.0 0.0
1982 5330 0.0 0.0 0.0
1983 4854 0.0 0.0 0.0
1984 5640 0.0 0.0 0.0
1985 7088 0.0 0.0 0.0
1986 6650 0.0 0.0 0.0
1987 8367 0.0 0.0 0.0
1988 8465 0.0 0.0 0.0
1989 8280 0.0 0.0 0.0
1990 8324 0.0 0.0 0.0
1991 6485 0.0 0.0 0.0
1992 7961 0.0 0.0 0.0
1993 8505 0.0 0.0 0.0
1994 8241 0.0 0.0 0.0
1995 8649 0.0 0.0 0.0
1996 8558 0.0 0.0 0.0
1997 8019 0.0 0.0 0.0
1998 8715 0.0 0.0 0.0
1999 8638 0.0 0.0 0.0
2000 8730 0.0 0.0 0.0
2001 8328 0.0 0.0 0.0
2002 8537 0.0 0.0 0.0
2003 8373 0.0 0.0 0.0
2004 8536 0.0 0.0 0.0
2005 8418 0.0 0.0 0.0
2006 8609 0.0 0.0 0.0
2007 8638 0.0 0.0 0.0
2008 8736 0.0 0.0 0.0
2009 8427 0.0 0.0 0.0
2010 8448 0.0 0.0 0.0
2011 8717 0.0 0.0 0.0
2012 8545 0.0 0.0 0.0
2013 8638 0.0 0.0 0.0
2014 8724 0.0 0.0 0.0
2015 8760 0.0 0.0 0.0
2016 8699 0.0 0.0 0.0
2017 8665 0.0 0.0 0.0
2018 8728 0.0 0.0 0.0
2019 8714 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References