X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104161802020

Well Details

Well ID: 0104161802020
Loading map...
Location: 02/02-18-010-16W4/0
Location Alias: 02/02-18-10-16 W4M
Location Alias 2: 02/02-18-010-16 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 16
Section: 18
County/Municipality: Taber
Well Name: CNRL TABER 2-18-10-16
Operator Name: Canadian Natural Resources Limited
License Number: 0168921
License Date: 1994-07-22
License Status: Issued
Spud Date: 1994-07-26
Final Drill Date: 1994-08-01
Well Total Depth: 1146.00 m
Surface Hole Latitude: 49.813883
Surface Hole Longitude: -112.157687

For data sources see[1][2]

Well History

Date Event
1994-07-22 Obtained License
1994-07-27 Surface Casing Operation Performed
1994-07-28 Direction Drilling Operation Performed - Deviate
1994-08-01 Finished Drilling
1994-08-01 Production Casing Operation Performed
1994-08-01 Well Log Performed
1994-08-01 Well Mode changed to Drilled and Cased
1994-08-02 Rig Released
1994-08-16 Perforation Treatment Performed - Jet Perforation
1994-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-18 Perforation Treatment Performed - Cement Squeeze
1994-08-21 Perforation Treatment Performed - Cement Squeeze
1994-08-21 Perforation Treatment Performed - Jet Perforation
1994-08-23 Perforation Treatment Performed - Jet Perforation
1994-08-26 Well Began Production
1994-08-26 Well Fluid changed to Crude Oil
1994-08-26 Well Mode changed to Pumping
1994-09-08 Well Log Performed
2007-01-01 Well Fluid changed to Crude Oil
2007-01-01 Well Mode changed to Suspended
2014-12-02 Well Type changed to Observation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-07-28 330.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-08-16 Perforation 1096.00 1100.00 13
1994-08-21 Perforation 1124.50 1125.00 13
1994-08-21 Cement Squeeze 1121.00 1122.50 0
1994-08-21 Cement Squeeze 1124.50 1125.00 0
1994-08-23 Perforation 1096.00 1100.00 13
1994-08-23 Perforation 1101.00 1106.00 13
1994-08-23 Perforation 1107.00 1109.00 13
1994-08-23 Perforation 1110.00 1111.00 13
1994-08-16 Perforation 1101.00 1106.00 13
1994-08-16 Perforation 1113.00 1114.00 13
1994-08-16 Perforation 1114.50 1117.00 13
1994-08-16 Perforation 1121.00 1122.50 13
1994-08-17 Acid Treatment 1113.00 1117.00 0
1994-08-18 Acid Treatment 1113.00 1117.00 0
1994-08-18 Cement Squeeze 1113.00 1117.00 0
1994-08-18 Cement Squeeze 1096.00 1106.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 2848 0.0 0.0 0.0
1995 8628 0.0 0.0 0.0
1996 8580 0.0 0.0 0.0
1997 7658 0.0 0.0 0.0
1998 8684 0.0 0.0 0.0
1999 8615 0.0 0.0 0.0
2000 8653 0.0 0.0 0.0
2001 8007 0.0 0.0 0.0
2002 7481 0.0 0.0 0.0
2003 17 0.0 0.0 0.0
2005 714 0.0 0.0 0.0

For data sources see[6]

References