X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104160502000

Well Details

Well ID: 0104160502000
Loading map...
Location: 00/02-05-010-16W4/0
Location Alias: 00/02-05-10-16 W4M
Location Alias 2: 00/02-05-010-16 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 16
Section: 05
County/Municipality: Taber
Well Name: CNRL TABER 2-5-10-16
Operator Name: Canadian Natural Resources Limited
License Number: 0121700
License Date: 1986-01-23
License Status: Suspension
Spud Date: 1986-01-27
Final Drill Date: 1986-02-07
Well Total Depth: 1170.00 m
Surface Hole Latitude: 49.782411
Surface Hole Longitude: -112.132350

For data sources see[1][2]

Well History

Date Event
1986-01-23 Obtained License
1986-01-28 Surface Casing Operation Performed
1986-01-29 Direction Drilling Operation Performed - Deviate
1986-01-31 Kick Occurred
1986-02-07 Finished Drilling
1986-02-07 Well Log Performed
1986-02-07 Well Mode changed to Drilled and Cased
1986-02-08 Production Casing Operation Performed
1986-02-09 Rig Released
1986-02-11 Well Log Performed
1986-02-12 Well Log Performed
1986-02-14 Perforation Treatment Performed - Jet Perforation
1986-03-01 Well Began Production
1986-03-01 Well Fluid changed to Crude Oil
1986-03-01 Well Mode changed to Pumping
1994-07-15 Perforation Treatment Performed - Fractured
2013-09-11 Well Log Performed
2013-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-09-13 Plug Back Performed
2013-09-13 Well Fluid changed to Crude Oil
2013-09-13 Well Mode changed to Abandoned Zone
2013-09-14 Perforation Treatment Performed - Cement Plug

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1986-01-29 214.50 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-14 Perforation 1154.50 1156.50 13
1986-02-14 Perforation 1150.50 1153.00 13
1986-02-14 Perforation 1145.00 1146.00 13
1994-07-15 Fracture 1145.00 1156.50 0
2013-09-13 Packing Device Capped w/Cement 1126.80 1134.80 0
2013-09-14 Cement Plug 1.50 9.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 5759 0.0 0.0 0.0
1987 6616 0.0 0.0 0.0
1988 8188 0.0 0.0 0.0
1989 8739 0.0 0.0 0.0
1990 8756 0.0 0.0 0.0
1991 8748 0.0 0.0 0.0
1992 8727 0.0 0.0 0.0
1993 8683 0.0 0.0 0.0
1994 6598 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8774 0.0 0.0 0.0
1997 8743 0.0 0.0 0.0
1998 4536 0.0 0.0 0.0
1999 8729 0.0 0.0 0.0
2000 8401 0.0 0.0 0.0
2001 8756 0.0 0.0 0.0
2002 8753 0.0 0.0 0.0
2003 8654 0.0 0.0 0.0
2004 8758 0.0 0.0 0.0
2005 8726 0.0 0.0 0.0
2006 8006 0.0 0.0 0.0
2007 7641 0.0 0.0 0.0
2008 8755 0.0 0.0 0.0
2009 8738 0.0 0.0 0.0
2010 8732 0.0 0.0 0.0
2011 8752 0.0 0.0 0.0
2012 8758 0.0 0.0 0.0
2013 2784 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-01-31 Kick 433.00 433.00
2013-09-15 No Incident Encountered 0.00 0.00

For data sources see[7]

References