X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104153012002

Well Details

Well ID: 0104153012002
Loading map...
Location: 00/12-30-010-15W4/2
Location Alias: 00/12-30-10-15 W4M
Location Alias 2: 00/12-30-010-15 W4/02
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 15
Section: 30
County/Municipality: Municipal District of Taber
Well Name: CNRL TABERN 12-30-10-15
Operator Name: Canadian Natural Resources Limited
License Number: 0394883
License Date: 2008-02-28
License Status: RecCertified
Spud Date: 2008-10-16
Final Drill Date: 2008-10-19
Well Total Depth: 1069.00 m
Surface Hole Latitude: 49.854408
Surface Hole Longitude: -112.032489

For data sources see[1][2]

Well History

Date Event
2008-02-28 Obtained License
2008-10-17 Direction Drilling Operation Performed - Deviate
2008-10-17 Surface Casing Operation Performed
2008-10-19 Finished Drilling
2008-10-19 Well Log Performed
2008-10-19 Well Mode changed to Drilled and Cased
2008-10-20 Production Casing Operation Performed
2008-10-20 Rig Released
2008-10-31 Perforation Treatment Performed - Jet Perforation
2008-10-31 Well Log Performed
2008-11-04 Perforation Treatment Performed - Jet Perforation
2008-11-04 Well Log Performed
2008-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-08 Perforation Treatment Performed - Jet Perforation
2008-11-08 Plug Back Performed
2008-11-08 Well Log Performed
2008-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-12 Plug Back Performed
2008-11-12 Well Log Performed
2008-11-12 Well Mode changed to Abandoned Zone
2012-08-01 Well Abandoned
2012-08-01 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-10-17 174.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-10-31 Perforation 1042.00 1045.00 20
2008-11-04 Perforation 1037.00 1040.00 20
2008-11-08 Packing Device Capped w/Cement 1021.00 1035.00 0
2008-11-08 Perforation 659.50 662.00 20
2008-11-12 Packing Device Capped w/Cement 644.50 655.00 0

For data sources see[5]



References