If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0104133516040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.871192,"lon":-111.657111,"icon":""}]} |
Location: 04/16-35-010-13W4/0 | |
Location Alias: 04/16-35-10-13 W4M | |
Location Alias 2: 04/16-35-010-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 010 | |
Meridian: 4 | |
Range: 13 | |
Section: 35 | |
County/Municipality: Municipal District of Taber | |
Well Name: SLE 104 BI 16-35-10-13 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0288766 | |
License Date: 2003-06-20 | |
License Status: Issued | |
Spud Date: 2003-06-27 | |
Final Drill Date: 2003-06-30 | |
Well Total Depth: 963.00 m | |
Surface Hole Latitude: 49.871192 | |
Surface Hole Longitude: -111.657111 |
Date | Event |
---|---|
2003-06-20 | Obtained License |
2003-06-28 | Surface Casing Operation Performed |
2003-06-30 | Finished Drilling |
2003-06-30 | Well Log Performed |
2003-06-30 | Well Mode changed to Drilled and Cased |
2003-07-02 | Production Casing Operation Performed |
2003-07-03 | Rig Released |
2003-07-07 | Well Log Performed |
2003-07-09 | Well Log Performed |
2003-07-12 | Perforation Treatment Performed - Jet Perforation |
2003-07-26 | Well Began Production |
2003-07-26 | Well Fluid changed to Crude Oil |
2003-07-26 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-07-12 | Perforation | 929.50 | 932.00 | 43 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 3797 | 0.0 | 0.0 | 0.0 |
2004 | 8715 | 0.0 | 0.0 | 0.0 |
2005 | 8691 | 0.0 | 0.0 | 0.0 |
2006 | 8698 | 0.0 | 0.0 | 0.0 |
2007 | 8688 | 0.0 | 0.0 | 0.0 |
2008 | 8713 | 0.0 | 0.0 | 0.0 |
2009 | 8734 | 0.0 | 0.0 | 0.0 |
2010 | 8570 | 0.0 | 0.0 | 0.0 |
2011 | 8741 | 0.0 | 0.0 | 0.0 |
2012 | 8377 | 0.0 | 0.0 | 0.0 |
2013 | 8477 | 0.0 | 0.0 | 0.0 |
2014 | 8661 | 0.0 | 0.0 | 0.0 |
2015 | 8657 | 0.0 | 0.0 | 0.0 |
2016 | 8684 | 0.0 | 0.0 | 0.0 |
2017 | 8677 | 0.0 | 0.0 | 0.0 |
2018 | 8716 | 0.0 | 0.0 | 0.0 |
2019 | 5729 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[5]