X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104132208000

Well Details

Well ID: 0104132208000
Loading map...
Location: 00/08-22-010-13W4/0
Location Alias: 00/08-22-10-13 W4M
Location Alias 2: 00/08-22-010-13 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 13
Section: 22
County/Municipality: Municipal District of Taber
Well Name: CNRL BI 8-22-10-13
Operator Name: Canadian Natural Resources Limited
License Number: 0086762
License Date: 1980-10-31
License Status: RecCertified
Spud Date: 1980-11-03
Final Drill Date: 1980-11-11
Well Total Depth: 941.00 m
Surface Hole Latitude: 49.835107
Surface Hole Longitude: -111.680801

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-31 Obtained License
1980-11-06 Kick Occurred
1980-11-07 Water Flow Occurred
1980-11-11 Finished Drilling
1980-11-11 Well Log Performed
1980-11-12 Drill Stem Test Performed
1980-11-14 Production Casing Operation Performed
1980-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-12-12 Perforation Treatment Performed - Jet Perforation
1980-12-14 Perforation Treatment Performed - Jet Perforation
1980-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-12-17 Perforation Treatment Performed - Jet Perforation
1980-12-31 Well Mode changed to Drilled and Cased
1983-09-26 Well Began Production
1983-09-26 Well Fluid changed to Gas
1983-09-26 Well Mode changed to Flowing
1989-03-01 Well Fluid changed to Gas
1989-03-01 Well Mode changed to Suspended
1992-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-10-13 Plug Back Performed
1992-10-13 Well Abandoned
1992-10-13 Well Fluid changed to Gas
1992-10-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-12-12 Perforation 908.00 909.00 7
1980-12-12 Packing Device Capped w/Cement 892.00 900.00 0
1980-12-14 Perforation 660.50 661.50 7
1980-12-14 Perforation 658.00 659.00 0
1980-12-15 Acid Treatment 658.00 661.50 0
1980-12-16 Packing Device Capped w/Cement 649.00 656.00 0
1980-12-17 Perforation 644.00 645.50 7
1992-10-13 Packing Device Capped w/Cement 631.00 639.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 2304 0.0 0.0 0.0
1984 7895 0.0 0.0 0.0
1985 8039 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 8759 0.0 0.0 0.0
1988 8759 0.0 0.0 0.0
1989 888 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-11-06 Kick 244.00 244.00
1980-11-07 Water Flow 611.00 0.00

For data sources see[6]

References