X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104102011000

Well Details

Well ID: 0104102011000
Loading map...
Location: 00/11-20-010-10W4/0
Location Alias: 00/11-20-10-10 W4M
Location Alias 2: 00/11-20-010-10 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 10
Section: 20
County/Municipality: County of Forty Mile No. 8
Well Name: HAREX BOW ISLAND 11-20-10-10
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0063439
License Date: 1977-04-13
License Status: RecCertified
Spud Date: 1977-04-22
Final Drill Date: 1977-04-28
Well Total Depth: 951.00 m
Surface Hole Latitude: 49.837440
Surface Hole Longitude: -111.326115

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-04-13 Obtained License
1977-04-25 Drill Stem Test Performed
1977-04-27 Drill Stem Test Performed
1977-04-28 Finished Drilling
1977-04-28 Production Casing Operation Performed
1977-05-20 Well Mode changed to Drilled and Cased
1977-06-02 Perforation Treatment Performed - Jet Perforation
1977-06-14 Perforation Treatment Performed - Jet Perforation
1977-11-15 Perforation Treatment Performed - Abrasa-Jet Perforation
1984-10-01 Perforation Treatment Performed - Jet Perforation
1984-10-01 Well Began Production
1984-10-01 Well Fluid changed to Gas
1984-10-01 Well Log Performed
1984-10-01 Well Mode changed to Flowing
1984-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-01 Well Fluid changed to Gas
1985-04-01 Well Mode changed to Suspended
1989-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-01-27 Plug Back Performed
1989-01-27 Well Abandoned
1989-01-27 Well Fluid changed to Gas
1989-01-27 Well Log Performed
1989-01-27 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-06-02 Perforation 675.40 676.40 7
1977-06-14 Perforation 671.20 672.70 7
1977-11-15 Hydra Jet Perforation 675.40 676.40 0
1984-10-01 Perforation 676.00 677.00 0
1984-10-02 Acid Treatment 676.00 677.00 0
1989-01-27 Packing Device Capped w/Cement 658.00 666.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1962 0.0 0.0 0.0
1985 1313 0.0 0.0 0.0

For data sources see[5]

References