If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0104102011000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.83744,"lon":-111.326115,"icon":""}]} |
| Location: 00/11-20-010-10W4/0 | |
| Location Alias: 00/11-20-10-10 W4M | |
| Location Alias 2: 00/11-20-010-10 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 010 | |
| Meridian: 4 | |
| Range: 10 | |
| Section: 20 | |
| County/Municipality: County of Forty Mile No. 8 | |
| Well Name: HAREX BOW ISLAND 11-20-10-10 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0063439 | |
| License Date: 1977-04-13 | |
| License Status: RecCertified | |
| Spud Date: 1977-04-22 | |
| Final Drill Date: 1977-04-28 | |
| Well Total Depth: 951.00 m | |
| Surface Hole Latitude: 49.837440 | |
| Surface Hole Longitude: -111.326115 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1977-04-13 | Obtained License |
| 1977-04-25 | Drill Stem Test Performed |
| 1977-04-27 | Drill Stem Test Performed |
| 1977-04-28 | Finished Drilling |
| 1977-04-28 | Production Casing Operation Performed |
| 1977-05-20 | Well Mode changed to Drilled and Cased |
| 1977-06-02 | Perforation Treatment Performed - Jet Perforation |
| 1977-06-14 | Perforation Treatment Performed - Jet Perforation |
| 1977-11-15 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 1984-10-01 | Perforation Treatment Performed - Jet Perforation |
| 1984-10-01 | Well Began Production |
| 1984-10-01 | Well Fluid changed to Gas |
| 1984-10-01 | Well Log Performed |
| 1984-10-01 | Well Mode changed to Flowing |
| 1984-10-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-04-01 | Well Fluid changed to Gas |
| 1985-04-01 | Well Mode changed to Suspended |
| 1989-01-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1989-01-27 | Plug Back Performed |
| 1989-01-27 | Well Abandoned |
| 1989-01-27 | Well Fluid changed to Gas |
| 1989-01-27 | Well Log Performed |
| 1989-01-27 | Well Mode changed to Abandoned Zone |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1977-06-02 | Perforation | 675.40 | 676.40 | 7 |
| 1977-06-14 | Perforation | 671.20 | 672.70 | 7 |
| 1977-11-15 | Hydra Jet Perforation | 675.40 | 676.40 | 0 |
| 1984-10-01 | Perforation | 676.00 | 677.00 | 0 |
| 1984-10-02 | Acid Treatment | 676.00 | 677.00 | 0 |
| 1989-01-27 | Packing Device Capped w/Cement | 658.00 | 666.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1984 | 1962 | 0.0 | 0.0 | 0.0 |
| 1985 | 1313 | 0.0 | 0.0 | 0.0 |
For data sources see[5]