If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0104081716000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.826885,"lon":-111.048544,"icon":""}]} |
Location: 00/16-17-010-08W4/0 | |
Location Alias: 00/16-17-10-08 W4M | |
Location Alias 2: 00/16-17-010-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 010 | |
Meridian: 4 | |
Range: 08 | |
Section: 17 | |
County/Municipality: County of Forty Mile No. 8 | |
Well Name: SALTA ENERCO MEDHAT 16-17-10-8 | |
Operator Name: South Alberta Energy Corp. | |
License Number: 0082676 | |
License Date: 1980-05-08 | |
License Status: RecCertified | |
Spud Date: 1980-05-13 | |
Final Drill Date: 1980-05-18 | |
Well Total Depth: 957.00 m | |
Surface Hole Latitude: 49.826885 | |
Surface Hole Longitude: -111.048544 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-05-08 | Obtained License |
1980-05-18 | Finished Drilling |
1980-05-19 | Production Casing Operation Performed |
1980-05-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-05-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-05-24 | Perforation Treatment Performed - Jet Perforation |
1980-05-25 | Perforation Treatment Performed - Jet Perforation |
1980-07-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-07-24 | Perforation Treatment Performed - Selective Jet Perforations |
1980-07-25 | Perforation Treatment Performed - Fractured |
1980-08-15 | Well Mode changed to Drilled and Cased |
1980-10-16 | Perforation Treatment Performed - Jet Perforation |
1980-10-16 | Well Mode changed to Drilled and Cased |
1980-11-05 | Perforation Treatment Performed - Fractured |
1981-07-30 | Well Began Production |
1981-07-30 | Well Fluid changed to Gas |
1981-07-30 | Well Mode changed to Flowing |
1995-06-14 | Well Fluid changed to Gas |
1995-06-14 | Well Mode changed to Closed |
1996-04-29 | Well Fluid changed to Gas |
1996-04-29 | Well Mode changed to Flowing |
1996-06-28 | Well Fluid changed to Gas |
1996-06-28 | Well Mode changed to Suspended |
1997-12-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-12-21 | Plug Back Performed |
1997-12-21 | Well Fluid changed to Gas |
1997-12-21 | Well Mode changed to Abandoned Zone |
1998-03-15 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-05-24 | Perforation | 939.50 | 940.50 | 6 |
1980-07-24 | Selective Jet Perforations | 573.80 | 574.80 | 0 |
1980-07-24 | Selective Jet Perforations | 575.80 | 578.20 | 0 |
1980-07-24 | Selective Jet Perforations | 579.20 | 586.00 | 0 |
1980-07-24 | Selective Jet Perforations | 587.00 | 587.00 | 0 |
1980-07-25 | Fracture | 571.20 | 587.00 | 0 |
1980-10-16 | Perforation | 364.00 | 367.80 | 3 |
1980-11-05 | Fracture | 364.00 | 367.80 | 0 |
1997-12-21 | Packing Device Capped w/Cement | 349.10 | 357.10 | 0 |
1980-05-24 | Acid Treatment | 939.50 | 940.50 | 0 |
1980-05-24 | Packing Device Capped w/Cement | 932.00 | 932.00 | 0 |
1980-05-25 | Perforation | 704.00 | 705.50 | 6 |
1980-05-25 | Perforation | 683.50 | 686.00 | 6 |
1980-05-25 | Perforation | 688.50 | 690.00 | 6 |
1980-07-24 | Packing Device Capped w/Cement | 700.00 | 700.00 | 0 |
1980-07-24 | Packing Device Capped w/Cement | 678.00 | 678.00 | 0 |
1980-07-24 | Selective Jet Perforations | 571.20 | 571.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 5044 | 0.0 | 0.0 | 0.0 |
1982 | 6790 | 0.0 | 0.0 | 0.0 |
1983 | 8316 | 0.0 | 0.0 | 0.0 |
1984 | 8524 | 0.0 | 0.0 | 0.0 |
1985 | 8591 | 0.0 | 0.0 | 0.0 |
1986 | 7927 | 0.0 | 0.0 | 0.0 |
1987 | 8665 | 0.0 | 0.0 | 0.0 |
1988 | 8609 | 0.0 | 0.0 | 0.0 |
1989 | 8599 | 0.0 | 0.0 | 0.0 |
1990 | 8144 | 0.0 | 0.0 | 0.0 |
1991 | 7491 | 0.0 | 0.0 | 0.0 |
1992 | 8115 | 0.0 | 0.0 | 0.0 |
1993 | 5842 | 0.0 | 0.0 | 0.0 |
1994 | 8340 | 0.0 | 0.0 | 0.0 |
1995 | 741 | 0.0 | 0.0 | 0.0 |
For data sources see[5]