X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104081406000

Well Details

Well ID: 0104081406000
Loading map...
Location: 00/06-14-010-08W4/0
Location Alias: 00/06-14-10-08 W4M
Location Alias 2: 00/06-14-010-08 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 08
Section: 14
County/Municipality: County of Forty Mile No. 8
Well Name: SALTA ENERCO MEDHAT 6-14-10-8
Operator Name: South Alberta Energy Corp.
License Number: 0066659
License Date: 1977-11-16
License Status: RecCertified
Spud Date: 1978-01-02
Final Drill Date: 1978-01-05
Well Total Depth: 722.70 m
Surface Hole Latitude: 49.822059
Surface Hole Longitude: -110.987252

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-16 Obtained License
1978-01-05 Finished Drilling
1978-01-05 Production Casing Operation Performed
1978-01-06 Well Mode changed to Drilled and Cased
1979-10-25 Perforation Treatment Performed - Jet Perforation
1979-10-26 Perforation Treatment Performed - Jet Perforation
1980-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-02-06 Perforation Treatment Performed - Jet Perforation
1980-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-10 Well Began Injection
1980-09-10 Well Fluid changed to Water
1980-09-10 Well Type changed to Disposal
1995-06-14 Well Fluid changed to Water
1995-06-14 Well Mode changed to Closed
1995-06-14 Well Type changed to Disposal
1998-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-03 Plug Back Performed
1998-02-03 Well Fluid changed to Water
1998-02-03 Well Mode changed to Abandoned Zone
1998-02-03 Well Type changed to Disposal
1998-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-05 Perforation Treatment Performed - Jet Perforation
1998-02-05 Perforation Treatment Performed - Remedial Casing
1998-02-05 Well Log Performed
1998-02-12 Perforation Treatment Performed - Cement Plug
1998-04-27 Perforation Treatment Performed - Jet Perforation
1998-04-27 Perforation Treatment Performed - Remedial Casing
1998-04-27 Well Log Performed
1998-05-11 Well Abandoned
1998-05-11 Well Fluid changed to Water
1998-05-11 Well Mode changed to Abandoned
1998-05-11 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-10-25 Perforation 669.60 671.20 7
1998-02-05 Acid Treatment 200.00 200.30 0
1998-02-05 Remedial Casing Cementing 200.00 200.30 0
1998-02-12 Cement Plug 162.00 200.30 0
1998-04-27 Perforation 195.00 196.00 14
1998-04-27 Remedial Casing Cementing 195.00 196.00 0
1979-10-25 Perforation 664.50 665.90 7
1979-10-26 Perforation 651.00 652.20 7
1979-10-26 Perforation 648.60 649.50 7
1980-02-06 Packing Device Capped w/Cement 661.40 661.40 0
1980-02-06 Perforation 653.50 657.20 13
1980-02-07 Acid Treatment 648.60 657.20 0
1998-02-03 Packing Device Capped w/Cement 632.00 640.00 0
1998-02-05 Perforation 200.00 200.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0

For data sources see[5]

References