If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0104050103002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.789247,"lon":-110.563648,"icon":""}]} |
| Location: 00/03-01-010-05W4/2 | |
| Location Alias: 00/03-01-10-05 W4M | |
| Location Alias 2: 00/03-01-010-05 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 010 | |
| Meridian: 4 | |
| Range: 05 | |
| Section: 01 | |
| County/Municipality: Cypress County | |
| Well Name: PINE CLIFF ELKW 3-1-10-5 | |
| Operator Name: Pine Cliff Energy Ltd. | |
| License Number: 0285517 | |
| License Date: 2003-04-03 | |
| License Status: Suspension | |
| Spud Date: 2003-07-18 | |
| Final Drill Date: 2003-07-23 | |
| Well Total Depth: 987.00 m | |
| Surface Hole Latitude: 49.789247 | |
| Surface Hole Longitude: -110.563648 |
| Date | Event |
|---|---|
| 2003-04-03 | Obtained License |
| 2003-07-18 | Surface Casing Operation Performed |
| 2003-07-23 | Finished Drilling |
| 2003-07-23 | Well Log Performed |
| 2003-07-23 | Well Mode changed to Drilled and Cased |
| 2003-07-24 | Production Casing Operation Performed |
| 2003-07-24 | Rig Released |
| 2003-08-05 | Well Log Performed |
| 2003-08-06 | Perforation Treatment Performed - Jet Perforation |
| 2003-08-11 | Perforation Treatment Performed - Jet Perforation |
| 2003-08-11 | Well Log Performed |
| 2003-08-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2003-08-12 | Plug Back Performed |
| 2003-08-12 | Well Fluid changed to Gas |
| 2003-08-12 | Well Mode changed to Testing |
| 2003-08-13 | Perforation Treatment Performed - Jet Perforation |
| 2003-08-13 | Well Log Performed |
| 2003-08-20 | Perforation Treatment Performed - Cement Squeeze |
| 2003-08-20 | Plug Back Performed |
| 2003-08-24 | Perforation Treatment Performed - Jet Perforation |
| 2003-08-24 | Well Log Performed |
| 2003-09-02 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2003-08-06 | Perforation | 960.00 | 961.00 | 17 |
| 2003-08-11 | Perforation | 822.00 | 825.00 | 14 |
| 2003-08-12 | Packing Device Capped w/Cement | 947.00 | 955.00 | 0 |
| 2003-08-13 | Perforation | 555.00 | 559.00 | 14 |
| 2003-08-20 | Cement Squeeze | 555.00 | 559.00 | 0 |
| 2003-08-24 | Perforation | 533.00 | 538.00 | 14 |
| 2003-09-02 | Fracture | 822.00 | 825.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2003 | 120 | 0.0 | 0.0 | 0.0 |
For data sources see[5]