If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0095023306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.776083,"lon":-114.219874,"icon":""}]} |
Location: 00/06-33-009-02W5/0 | |
Location Alias: 00/06-33-09-02 W5M | |
Location Alias 2: 00/06-33-009-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 5 | |
Range: 02 | |
Section: 33 | |
County/Municipality: Municipal District of Pincher Creek No. 9 | |
Well Name: COMPTON TODD 6-33-9-2 | |
Operator Name: Lexin Resources Ltd. | |
License Number: 0052408 | |
License Date: 1975-01-07 | |
License Status: Issued | |
Spud Date: 1975-01-12 | |
Final Drill Date: 1975-02-26 | |
Well Total Depth: 1844.00 m | |
Surface Hole Latitude: 49.776083 | |
Surface Hole Longitude: -114.219874 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-01-07 | Obtained License |
1975-02-26 | Finished Drilling |
1975-03-02 | Production Casing Operation Performed |
1975-05-18 | Perforation Treatment Performed - Jet Perforation |
1975-05-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-05-24 | Perforation Treatment Performed - Fractured |
1975-07-30 | Perforation Treatment Performed - Fractured |
1975-08-16 | Perforation Treatment Performed - Alcohol Squeeze |
1975-08-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-08-30 | Well Mode changed to Drilled and Cased |
1975-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1975-10-17 | Perforation Treatment Performed - Jet Perforation |
1975-10-17 | Plug Back Performed |
1975-10-18 | Perforation Treatment Performed - Cement Squeeze |
1975-10-20 | Perforation Treatment Performed - Jet Perforation |
1975-10-21 | Perforation Treatment Performed - Cement Squeeze |
1975-10-24 | Perforation Treatment Performed - Fractured |
1975-10-24 | Perforation Treatment Performed - Jet Perforation |
1975-11-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-11-01 | Perforation Treatment Performed - Jet Perforation |
1975-11-12 | Perforation Treatment Performed - Fractured |
1975-11-26 | Perforation Treatment Performed - Jet Perforation |
2006-09-12 | Well Began Production |
2006-09-12 | Well Fluid changed to Gas |
2006-09-12 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-05-18 | Perforation | 1111.90 | 1113.70 | 3 |
1975-10-17 | Packing Device Capped w/Cement | 1095.10 | 1101.90 | 0 |
1975-10-17 | Perforation | 996.40 | 996.40 | 7 |
1975-10-18 | Cement Squeeze | 996.40 | 996.40 | 0 |
1975-10-20 | Perforation | 981.50 | 981.50 | 7 |
1975-10-21 | Cement Squeeze | 981.50 | 981.50 | 0 |
1975-10-24 | Perforation | 988.80 | 995.50 | 7 |
1975-10-24 | Fracture | 988.80 | 995.50 | 0 |
1975-11-01 | Perforation | 992.10 | 995.20 | 13 |
1975-11-01 | Acid Treatment | 988.80 | 995.50 | 0 |
1975-11-12 | Fracture | 988.80 | 995.50 | 0 |
1975-05-18 | Perforation | 1122.60 | 1126.20 | 3 |
1975-11-26 | Perforation | 1111.90 | 1113.70 | 3 |
1975-11-26 | Perforation | 1122.60 | 1126.20 | 3 |
1975-11-26 | Perforation | 1146.00 | 1147.90 | 3 |
1975-11-26 | Perforation | 1150.30 | 1151.30 | 3 |
1975-05-18 | Perforation | 1146.00 | 1147.90 | 3 |
1975-05-18 | Perforation | 1150.30 | 1151.50 | 3 |
1975-05-24 | Acid Treatment | 1111.90 | 1151.50 | 0 |
1975-05-24 | Fracture | 1111.90 | 1151.50 | 0 |
1975-07-30 | Fracture | 1111.90 | 1151.50 | 0 |
1975-08-16 | Alchohol Squeeze | 1111.90 | 1151.50 | 0 |
1975-08-29 | Acid Treatment | 1111.90 | 1151.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 2454 | 0.0 | 0.0 | 0.0 |
2007 | 8528 | 0.0 | 0.0 | 0.0 |
2008 | 8581 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8663 | 0.0 | 0.0 | 0.0 |
2011 | 8663 | 0.0 | 0.0 | 0.0 |
2012 | 8519 | 0.0 | 0.0 | 0.0 |
2013 | 8682 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 6875 | 0.0 | 0.0 | 0.0 |
2017 | 1024 | 0.0 | 0.0 | 0.0 |
For data sources see[5]