If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0094240803000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.729212,"lon":-113.220579,"icon":""}]} |
Location: 00/03-08-009-24W4/0 | |
Location Alias: 00/03-08-09-24 W4M | |
Location Alias 2: 00/03-08-009-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 4 | |
Range: 24 | |
Section: 08 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: TORC HZ PEARCE 3-8-9-24 | |
Operator Name: TORC Oil & Gas Ltd. | |
License Number: 0445102 | |
License Date: 2012-03-26 | |
License Status: Issued | |
Spud Date: 2012-04-11 | |
Final Drill Date: 2012-05-08 | |
Well Total Depth: 3799.00 m | |
Surface Hole Latitude: 49.729212 | |
Surface Hole Longitude: -113.220579 |
Date | Event |
---|---|
2012-03-02 | Well Log Performed |
2012-03-26 | Obtained License |
2012-04-13 | Surface Casing Operation Performed |
2012-04-26 | Direction Drilling Operation Performed - Horizontal |
2012-04-29 | Well Log Performed |
2012-04-30 | Intermediate Casing Operation Performed |
2012-05-08 | Finished Drilling |
2012-05-08 | Well Log Performed |
2012-05-08 | Well Mode changed to Drilled and Cased |
2012-05-10 | Liner Casing Operation Performed |
2012-05-12 | Rig Released |
2012-05-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-23 | Perforation Treatment Performed - Open-Hole Completion |
2012-05-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-25 | Well Began Production |
2012-06-25 | Well Fluid changed to Crude Oil |
2012-06-25 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-04-11 | Trinidad Drilling Ltd. | 34E | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-04-26 | 2351.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-05-23 | Open Hole/Barefoot Completion | 3794.00 | 3799.00 | 0 |
2012-05-24 | Multi-Stage Fracture | 3186.60 | 3186.70 | 0 |
2012-05-24 | Multi-Stage Fracture | 3110.70 | 3110.80 | 0 |
2012-05-24 | Multi-Stage Fracture | 3035.60 | 3035.70 | 0 |
2012-05-25 | Multi-Stage Fracture | 2973.40 | 2973.50 | 0 |
2012-05-25 | Multi-Stage Fracture | 2911.30 | 2911.40 | 0 |
2012-05-25 | Multi-Stage Fracture | 2849.00 | 2849.10 | 0 |
2012-05-25 | Multi-Stage Fracture | 2788.60 | 2788.70 | 0 |
2012-05-25 | Multi-Stage Fracture | 2727.30 | 2727.40 | 0 |
2012-05-25 | Multi-Stage Fracture | 2665.70 | 2665.80 | 0 |
2012-05-25 | Multi-Stage Fracture | 2603.80 | 2603.90 | 0 |
2012-05-23 | Multi-Stage Fracture | 3776.00 | 3776.10 | 0 |
2012-05-25 | Multi-Stage Fracture | 2527.80 | 2527.90 | 0 |
2012-05-28 | Multi-Stage Fracture | 2453.30 | 2453.40 | 0 |
2012-05-23 | Multi-Stage Fracture | 3700.30 | 3700.40 | 0 |
2012-05-24 | Multi-Stage Fracture | 3625.30 | 3625.40 | 0 |
2012-05-24 | Multi-Stage Fracture | 3549.70 | 3549.80 | 0 |
2012-05-24 | Multi-Stage Fracture | 3473.90 | 3474.00 | 0 |
2012-05-24 | Multi-Stage Fracture | 3399.00 | 3399.10 | 0 |
2012-05-24 | Multi-Stage Fracture | 3324.20 | 3324.30 | 0 |
2012-05-24 | Multi-Stage Fracture | 3248.70 | 3248.80 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4348 | 0.0 | 0.0 | 0.0 |
2013 | 8298 | 0.0 | 0.0 | 0.0 |
2014 | 6186 | 0.0 | 0.0 | 0.0 |
2015 | 6411 | 0.0 | 0.0 | 0.0 |
2016 | 5945 | 0.0 | 0.0 | 0.0 |
2017 | 6432 | 0.0 | 0.0 | 0.0 |
2018 | 8628 | 0.0 | 0.0 | 0.0 |
2019 | 7795 | 0.0 | 0.0 | 0.0 |
2020 | 1095 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-05-12 | No Incident Encountered | 0.00 | 0.00 |
2012-06-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]