X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094240803000

Well Details

Well ID: 0094240803000
Loading map...
Location: 00/03-08-009-24W4/0
Location Alias: 00/03-08-09-24 W4M
Location Alias 2: 00/03-08-009-24 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 24
Section: 08
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: TORC HZ PEARCE 3-8-9-24
Operator Name: TORC Oil & Gas Ltd.
License Number: 0445102
License Date: 2012-03-26
License Status: Issued
Spud Date: 2012-04-11
Final Drill Date: 2012-05-08
Well Total Depth: 3799.00 m
Surface Hole Latitude: 49.729212
Surface Hole Longitude: -113.220579

For data sources see[1][2]

Well History

Date Event
2012-03-02 Well Log Performed
2012-03-26 Obtained License
2012-04-13 Surface Casing Operation Performed
2012-04-26 Direction Drilling Operation Performed - Horizontal
2012-04-29 Well Log Performed
2012-04-30 Intermediate Casing Operation Performed
2012-05-08 Finished Drilling
2012-05-08 Well Log Performed
2012-05-08 Well Mode changed to Drilled and Cased
2012-05-10 Liner Casing Operation Performed
2012-05-12 Rig Released
2012-05-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-23 Perforation Treatment Performed - Open-Hole Completion
2012-05-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-25 Well Began Production
2012-06-25 Well Fluid changed to Crude Oil
2012-06-25 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-04-11 Trinidad Drilling Ltd. 34E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-04-26 2351.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-23 Open Hole/Barefoot Completion 3794.00 3799.00 0
2012-05-24 Multi-Stage Fracture 3186.60 3186.70 0
2012-05-24 Multi-Stage Fracture 3110.70 3110.80 0
2012-05-24 Multi-Stage Fracture 3035.60 3035.70 0
2012-05-25 Multi-Stage Fracture 2973.40 2973.50 0
2012-05-25 Multi-Stage Fracture 2911.30 2911.40 0
2012-05-25 Multi-Stage Fracture 2849.00 2849.10 0
2012-05-25 Multi-Stage Fracture 2788.60 2788.70 0
2012-05-25 Multi-Stage Fracture 2727.30 2727.40 0
2012-05-25 Multi-Stage Fracture 2665.70 2665.80 0
2012-05-25 Multi-Stage Fracture 2603.80 2603.90 0
2012-05-23 Multi-Stage Fracture 3776.00 3776.10 0
2012-05-25 Multi-Stage Fracture 2527.80 2527.90 0
2012-05-28 Multi-Stage Fracture 2453.30 2453.40 0
2012-05-23 Multi-Stage Fracture 3700.30 3700.40 0
2012-05-24 Multi-Stage Fracture 3625.30 3625.40 0
2012-05-24 Multi-Stage Fracture 3549.70 3549.80 0
2012-05-24 Multi-Stage Fracture 3473.90 3474.00 0
2012-05-24 Multi-Stage Fracture 3399.00 3399.10 0
2012-05-24 Multi-Stage Fracture 3324.20 3324.30 0
2012-05-24 Multi-Stage Fracture 3248.70 3248.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4348 0.0 0.0 0.0
2013 8298 0.0 0.0 0.0
2014 6186 0.0 0.0 0.0
2015 6411 0.0 0.0 0.0
2016 5945 0.0 0.0 0.0
2017 6432 0.0 0.0 0.0
2018 8628 0.0 0.0 0.0
2019 7795 0.0 0.0 0.0
2020 1095 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-12 No Incident Encountered 0.00 0.00
2012-06-17 No Incident Encountered 0.00 0.00

For data sources see[8]

References