If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0094172608020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 02/08-26-009-17W4/0 | |
| Location Alias: 02/08-26-09-17 W4M | |
| Location Alias 2: 02/08-26-009-17 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 009 | |
| Meridian: 4 | |
| Range: 17 | |
| Section: 26 | |
| County/Municipality: Municipal District of Taber | |
| Well Name: CNRL TABER 8-26-9-17 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0111514 | |
| License Date: 1984-12-10 | |
| License Status: Abandoned | |
| Spud Date: 1984-12-28 | |
| Final Drill Date: 1985-01-13 | |
| Well Total Depth: 1072.00 m | |
| Surface Hole Latitude: 49.763769 | |
| Surface Hole Longitude: -112.195654 |
| Date | Event |
|---|---|
| 1984-12-10 | Obtained License |
| 1984-12-30 | Surface Casing Operation Performed |
| 1985-01-01 | Direction Drilling Operation Performed - Deviate |
| 1985-01-03 | Plug Back Performed |
| 1985-01-05 | Direction Drilling Operation Performed - Deviate |
| 1985-01-13 | Finished Drilling |
| 1985-01-13 | Well Mode changed to Drilled and Cased |
| 1985-01-14 | Well Log Performed |
| 1985-01-15 | Production Casing Operation Performed |
| 1985-01-15 | Rig Released |
| 1985-01-17 | Well Log Performed |
| 1985-01-23 | Perforation Treatment Performed - Jet Perforation |
| 1985-02-01 | Well Began Production |
| 1985-02-01 | Well Fluid changed to Crude Oil |
| 1985-02-01 | Well Mode changed to Pumping |
| 1985-10-18 | Well Log Performed |
| 1986-01-31 | Perforation Treatment Performed - Cement Squeeze |
| 1986-02-04 | Well Log Performed |
| 1986-02-05 | Perforation Treatment Performed - Jet Perforation |
| 1986-03-01 | Well Fluid changed to Crude Oil |
| 1986-03-01 | Well Mode changed to Suspended |
| 1991-05-31 | Well Fluid changed to Crude Oil |
| 1991-05-31 | Well Mode changed to Pumping |
| 1994-08-02 | Perforation Treatment Performed - Jet Perforation |
| 1995-11-01 | Well Fluid changed to Crude Oil |
| 1995-11-01 | Well Mode changed to Suspended |
| 1996-09-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-09-05 | Plug Back Performed |
| 1996-09-05 | Well Fluid changed to Crude Oil |
| 1996-09-05 | Well Mode changed to Abandoned Zone |
| 1997-09-30 | Well Abandoned |
| 1997-09-30 | Well Fluid changed to Crude Oil |
| 1997-09-30 | Well Mode changed to Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1985-01-01 | 304.00 | Deviate (5 - 79 degrees) |
| 1985-01-05 | 488.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1985-01-23 | Perforation | 1028.00 | 1029.50 | 13 |
| 1985-01-23 | Perforation | 1030.50 | 1035.00 | 13 |
| 1986-01-31 | Cement Squeeze | 1028.00 | 1035.00 | 0 |
| 1986-02-05 | Perforation | 1036.00 | 1038.00 | 13 |
| 1994-08-02 | Perforation | 1028.00 | 1029.50 | 13 |
| 1994-08-02 | Perforation | 1030.50 | 1035.00 | 13 |
| 1996-09-05 | Packing Device Capped w/Cement | 1015.00 | 1023.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1985 | 5942 | 0.0 | 0.0 | 0.0 |
| 1986 | 608 | 0.0 | 0.0 | 0.0 |
| 1991 | 4781 | 0.0 | 0.0 | 0.0 |
| 1992 | 8777 | 0.0 | 0.0 | 0.0 |
| 1993 | 6872 | 0.0 | 0.0 | 0.0 |
| 1994 | 4175 | 0.0 | 0.0 | 0.0 |
| 1995 | 3863 | 0.0 | 0.0 | 0.0 |
For data sources see[6]