If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0094172602B02 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: B0/02-26-009-17W4/2 | |
Location Alias: B0/02-26-09-17 W4M | |
Location Alias 2: B0/02-26-009-17 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 4 | |
Range: 17 | |
Section: 26 | |
County/Municipality: Municipal District of Taber | |
Well Name: CNRL TABER 2-26-9-17 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0177725 | |
License Date: 1995-05-04 | |
License Status: Suspension | |
Spud Date: 1995-11-20 | |
Final Drill Date: 1995-11-26 | |
Well Total Depth: 1046.00 m | |
Surface Hole Latitude: 49.757399 | |
Surface Hole Longitude: -112.207715 |
Date | Event |
---|---|
1995-05-04 | Obtained License |
1995-11-21 | Surface Casing Operation Performed |
1995-11-23 | Direction Drilling Operation Performed - Deviate |
1995-11-26 | Finished Drilling |
1995-11-26 | Well Mode changed to Drilled and Cased |
1995-11-27 | Production Casing Operation Performed |
1995-11-27 | Well Log Performed |
1995-11-28 | Rig Released |
1995-12-09 | Perforation Treatment Performed - Jet Perforation |
1995-12-11 | Well Began Production |
1995-12-11 | Well Fluid changed to Crude Oil |
1995-12-11 | Well Mode changed to Pumping |
1995-12-14 | Well Log Performed |
2000-01-05 | Well Fluid changed to Crude Oil |
2000-01-05 | Well Mode changed to Suspended |
2009-12-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-12-19 | Plug Back Performed |
2009-12-19 | Well Fluid changed to Crude Oil |
2009-12-19 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1995-11-23 | 241.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-12-09 | Perforation | 1032.00 | 1034.50 | 13 |
1995-12-09 | Perforation | 1009.00 | 1013.00 | 13 |
1995-12-09 | Perforation | 1014.00 | 1015.00 | 13 |
2009-12-19 | Packing Device Capped w/Cement | 997.00 | 1005.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 464 | 0.0 | 0.0 | 0.0 |
1996 | 8133 | 0.0 | 0.0 | 0.0 |
1997 | 8721 | 0.0 | 0.0 | 0.0 |
1998 | 8736 | 0.0 | 0.0 | 0.0 |
1999 | 8417 | 0.0 | 0.0 | 0.0 |
For data sources see[6]