If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0094172514030 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 03/14-25-009-17W4/0 | |
Location Alias: 03/14-25-09-17 W4M | |
Location Alias 2: 03/14-25-009-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 4 | |
Range: 17 | |
Section: 25 | |
County/Municipality: Municipal District of Taber | |
Well Name: CNRL TABER 14-25-9-17 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0171766 | |
License Date: 1994-10-24 | |
License Status: Issued | |
Spud Date: 1994-11-22 | |
Final Drill Date: 1994-11-28 | |
Well Total Depth: 1061.00 m | |
Surface Hole Latitude: 49.770701 | |
Surface Hole Longitude: -112.184536 |
Date | Event |
---|---|
1994-10-24 | Obtained License |
1994-11-22 | Surface Casing Operation Performed |
1994-11-22 | Well Log Performed |
1994-11-24 | Direction Drilling Operation Performed - Deviate |
1994-11-28 | Finished Drilling |
1994-11-28 | Well Log Performed |
1994-11-28 | Well Mode changed to Drilled and Cased |
1994-11-29 | Production Casing Operation Performed |
1994-11-29 | Rig Released |
1994-11-29 | Well Log Performed |
1994-12-16 | Perforation Treatment Performed - Jet Perforation |
1994-12-16 | Well Log Performed |
1994-12-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-12-17 | Plug Back Performed |
1994-12-17 | Well Log Performed |
1994-12-18 | Perforation Treatment Performed - Jet Perforation |
1994-12-18 | Well Log Performed |
1994-12-28 | Well Began Production |
1994-12-28 | Well Fluid changed to Crude Oil |
1994-12-28 | Well Mode changed to Pumping |
2002-09-01 | Well Fluid changed to Crude Oil |
2002-09-01 | Well Mode changed to Suspended |
2008-09-30 | Well Fluid changed to Crude Oil |
2008-09-30 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1994-11-24 | 190.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-12-16 | Perforation | 1046.00 | 1050.00 | 13 |
1994-12-17 | Packing Device Capped w/Cement | 1041.50 | 1044.50 | 0 |
1994-12-18 | Perforation | 1030.50 | 1036.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 111 | 0.0 | 0.0 | 0.0 |
1995 | 8722 | 0.0 | 0.0 | 0.0 |
1996 | 8599 | 0.0 | 0.0 | 0.0 |
1997 | 8710 | 0.0 | 0.0 | 0.0 |
2008 | 1999 | 0.0 | 0.0 | 0.0 |
2009 | 8662 | 0.0 | 0.0 | 0.0 |
2010 | 8387 | 0.0 | 0.0 | 0.0 |
2011 | 6120 | 0.0 | 0.0 | 0.0 |
2012 | 8506 | 0.0 | 0.0 | 0.0 |
2013 | 8658 | 0.0 | 0.0 | 0.0 |
2014 | 8698 | 0.0 | 0.0 | 0.0 |
2015 | 8688 | 0.0 | 0.0 | 0.0 |
2016 | 8732 | 0.0 | 0.0 | 0.0 |
2017 | 8664 | 0.0 | 0.0 | 0.0 |
2018 | 7112 | 0.0 | 0.0 | 0.0 |
2019 | 8507 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[6]